hit counter script
Download Print this page
Hide thumbs Also See for FX10X:

Advertisement

PRIMARY SHEAVE AND DRIVE V-BELT
È:
1st
120 Nm (12.0 m
2nd
60 Nm (6.0 m
Order
Job name/Part name
Primary sheave and drive V-belt
removal
Left side cover/Drive guard
1
V-belt
2
Primary sheave assembly
PRIMARY SHEAVE AND DRIVE V-BELT
POWER TRAIN
kg, 85 ft
lb)
kg, 43 ft
lb)
2
E
Q'ty
Remove the parts in the order listed below.
Refer to "COVERS" in CHAPTER 3.
1
1
For installation, reverse the removal proce-
dure.
4-1
POWR
TR
1
È
Remarks
s

Hide quick links:

Advertisement

Chapters

loading

This manual is also suitable for:

Fx10rtxFx10mtrxFx10mtraxFx10rtraxFx10rtrxFx10mtx