hit counter script

Checking The Installation; Verifying The Installation - Cisco ASR 9000 Series Installation Manual

Aggregation services router ethernet line card
Hide thumbs Also See for ASR 9000 Series:
Table of Contents

Advertisement

Installing and Removing Modular Port Adapters

Checking the Installation

This section describes the procedures you can use to verify the modular line card (MLC) and modular
port adapter (MPA) installation, and includes information on the following topics:

Verifying the Installation

This section describes how to verify the MLC and MPA installation by observing the MLC LED states,
the MPA LED states, and the information displayed on the console terminal.
When the system has reinitialized all interfaces, the MLC STATUS LED should be green (on) and the
MPA STATUS LEDs should be green (on). The port LEDs (C/A and A/L) may be green (on), depending
on your connections and configuration. The console screen also displays a message as the system
discovers each interface during its reinitialization.
The following sample display shows the events logged by the system as a MLC with a MPA was removed
from module slot 4 in the router. In this example, interface 0 (interface 4/0/0) on the MPA was up and
active when the MLC was removed from the router. Note that the system logs that the MLC was removed
from slot 4 and that interface 4/0/0 is changed to down.
RP/0/RSP0/CPU0:Dec 21 21:55:21.196 : invmgr[246]: %PLATFORM-INV-6-OIROUT : OIR: Node
0/4/CPU0 removed
RP/0/RSP0/CPU0:Dec 21 21:55:21.176 : invmgr[246]: %PLATFORM-INV-6-OIROUT : OIR: Node 0/4/0
removed
When you reinsert the MLC with the installed MPA, the system automatically brings up the interface
that was changed to down when the MLC was removed.
RP/0/RSP0/CPU0:Dec 21 21:55:50.318 : invmgr[246]: %PLATFORM-INV-6-OIRIN : OIR: Node
0/4/CPU0 inserted
...
RP/0/RSP0/CPU0:Dec 21 21:59:12.979 : shelfmgr[371]: %PLATFORM-SHELFMGR-6-NODE_STATE_CHANGE
: 0/4/0 A9K-MPA-4X10GE state:INITIALIZED
..
LC/0/4/CPU0:Dec 19 15:07:33.019 : ifmgr[196]: %PKT_INFRA-LINEPROTO-5-UPDOWN : Line
protocol on Interface GigabitEthernet0/4/0/0, changed state to Up
Use the following procedure to verify that a MLC and MPA are installed correctly:
Observe the console display messages and verify that the system discovers the MLC, while the system
Step 1
reinitializes each interface, as follows:
Cisco ASR 9000 Series Aggregation Services Router Ethernet Line Card Installation Guide
2-22
Verifying the Installation, page 2-22
Using show Commands to Verify Modular Line Card and Modular Port Adapter Status, page 2-23
Using show Commands to Display Modular Port Adapter Information, page 2-24
Using the ping Command to Verify Network Connectivity, page 2-26
As a MLC is initialized, the STATUS LED will first be amber, indicating that power is on, but the
MLC is being configured. When the MLC is active, the STATUS LED will illuminate green.
Modular port adapters (MPAs) will follow the same sequence after the MLC has completed its
initialization. The MPA STATUS LEDs will illuminate amber, turning to green when the modular
port adapters (MPAs) become active.
Chapter 2
Installing Line Cards in the Cisco ASR 9000 Series Router

Advertisement

Table of Contents
loading

Table of Contents