hit counter script

Cisco Sce8000 Installation Checklist - Cisco SCE8000 Installation And Configuration Manual

Cisco systems router installation and configuration guide
Hide thumbs Also See for SCE8000:
Table of Contents

Advertisement

Cisco SCE8000 Installation Checklist

Table 2-10
Component
Power cables
Grounding kit 69-0815-01
Optical Bypass module kit
Cisco does not ship the entire Cisco SCE8000 documentation set automatically with each system. You
Note
must specifically order the documentation as part of the sales order. If you ordered documentation and
did not receive it, we will ship the documents to you within 24 hours. To order documents, contact a
customer service representative.
Cisco SCE8000 Installation Checklist
To assist you with your installation and to provide a historical record of what was done by whom,
photocopy the following Cisco SCE8000 Installation Checklist. Indicate when each procedure or
verification is completed. When the checklist is completed, place it in your site log along with the other
records for your new Cisco SCE8000 platform.
Table 2-11
Cisco SCE8000 Installation Checklist
Task
Date Cisco SCE8000 received
Cisco SCE8000 and all accessories unpacked
Safety recommendations and guidelines reviewed
Topology verified: number of Cisco SCE8000 platforms, number of
links, and whether inline or receive-only
Installation Checklist copied
Site log established and background information entered
Site power voltages verified
Site environmental specifications verified
Required passwords, IP addresses, device names, and so on, needed
for initial configuration available (refer to
page
5-2)
Required tools available
Network connection equipment available
Cisco SCE8000 mounted in rack
System grounding established, if required
Cisco SCE8000 Installation and Configuration Guide, Rel 3.1.7
2-14
Cisco SCE8000 Component List (continued)
Description
Two AC power supply cords, if ordered with AC-input power
supply units
Initial Setup Parameters,
Chapter 2
Introduction to the Cisco SCE8000 Platform
Grounding lug
Two M4 hex-head screws with locking washers
Optical Bypass Module
Control Cable (2 m)
Control Cable (40 cm)
Verified By
Date
OL-16478-03

Advertisement

Table of Contents
loading

Table of Contents

Save PDF