hit counter script

Table 1-2 Ons 15454 Sdh Shelf Installation Task Summary - Cisco ONS 15454 SDH Procedure Manual

Hide thumbs Also See for ONS 15454 SDH:
Table of Contents

Advertisement

Chapter 1
Install the Shelf and FMECs
Table 1-2
Description
NTP-D1 Unpack and Inspect the ONS 15454 SDH Shelf Assembly, page 1-4
NTP-D2 Install the Shelf Assembly, page 1-5
NTP-D3 Open and Remove the Front Door, page 1-6
NTP-D219 Open and Remove the FMEC Cover, page 1-7
NTP-D220 Install the Power and Signal FMECs, page 1-7
NTP-D6 Install the Power and Ground, page 1-10
NTP-D7 Install the Fan-Tray Assembly, page 1-11
NTP-D222 Install the E1-75/120 Conversion Panel, page 1-13
NTP-D223 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections,
page 1-15
NTP-D224 Install the Electrical Card Cables on the FMECs, page 1-16
NTP-D10 Route Electrical Cables, page 1-16
NTP-D226 Install and Close the FMEC Cover, page 1-17
Complete the
Step 2
Step 3
Complete the
Step 4
Continue with
Stop. You have completed this procedure.
78-17194-01
ONS 15454 SDH Shelf Installation Task Summary
"DLP-D32 Inspect the Shelf Installation and Connections" task on page
"DLP-D33 Measure Voltage" task on page
Chapter 2, "Install Cards and Fiber-Optic Cable."
NTP- D13 Perform the Shelf Installation Acceptance Test
17-26.
Cisco ONS 15454 SDH Procedure Guide, R7.0
Completed
17-26.
1-19

Advertisement

Table of Contents
loading

Table of Contents