NTP- D48 Subtend an MS-SPRing from an MS-SPRing
Attach fibers from the trunk cards in the subtending node to the MS-SPRing trunk cards on its two
Step 3
neighboring MS-SPRing nodes. In
Node 4/Slot 13 connects to Node 5/Slot 6. See the
MS-SPRing Configurations" task on page
Create the DCCs on the first STM-N card that will carry the MS-SPRing. See the
Step 4
Regenerator-Section DCC Terminations" task on page
needed for CTC management, complete the
Terminations" task on page
Repeat
Step 5
Complete the
Step 6
be in the MS-SPRing. If you have already provisioned the MS-SPRing, perform this procedure for the
subtending node only.
Step 7
If the subtending MS-SPRing is not already created, complete the
procedure on page 5-13
name that differs from the ring name of the first MS-SPRing.
Note
From the View menu choose Go to Network View to see the subtending ring.
Step 8
Figure 5-14
Figure 5-14
Stop. You have completed this procedure.
Cisco ONS 15454 SDH Procedure Guide, R7.0
5-42
20-71.
Step 4
for the second STM-N trunk card that will carry the MS-SPRing.
"NTP-D40 Provision MS-SPRing Nodes" procedure on page 5-10
to provision the new MS-SPRing. The subtending MS-SPRing must have a ring
The subtending node can have one Node ID that is used in both MS-SPRings, or a different
Node ID for each MS-SPRing. For example, the same node can be Node 4 in MS-SPRing 1 and
Node 2 in MS-SPRing 2.
shows an example of two subtending MS-SPRings.
View Subtended MS-SPRings on the Network Map
Figure
5-13, Node 4/Slot 6 connects to Node 7/Slot 13, and
"DLP-D338 Install Fiber-Optic Cables for
20-37.
20-68. Alternatively, if additional bandwidth is
"DLP-D364 Provision Multiplex-Section DCC
Chapter 5
Turn Up a Network
"DLP-D363 Provision
for each node that will
"NTP-D41 Create the MS-SPRing"
78-17194-01