Chapter 19
DLPs D200 to D299
•
If you selected Manual in
Step 12
to the new port. If you selected Auto, continue with
For both manual and automatic rolls, click Finish to complete the circuit roll process.
Step 13
The roll is cleared from the Rolls tab and the new rolled circuit on the Circuits tab returns to the
DISCOVERED status.
Return to your originating procedure (NTP).
Step 14
DLP-D236 Roll Two Cross-Connects on One Optical Circuit Using Automatic
Routing
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
From the View menu, choose Go To Network View.
Step 1
Click the Circuits tab.
Step 2
Click the circuit that has the connections that you want to roll. The circuit must have a DISCOVERED
Step 3
status for you to start a roll.
From the Tools menu, choose Circuits > Roll Circuit.
Step 4
In the Roll Attributes area, complete the following
Step 5
a.
b.
78-17194-01
A roll can be forced onto the Roll To Circuit destination without a valid signal by using the
Force Valid Signal button. If you choose Force Valid Signal, traffic on the circuit that is involved in
the roll will be dropped when the roll is completed.
Step
This task reroutes the network path while maintaining the same source and
destination. This task allows CTC to automatically select a Roll To path.
None
DLP-D60 Log into CTC, page 17-49
As needed
Onsite or remote
Provisioning or higher
From the Circuit Roll Mode drop-down list, choose Auto to create an automatic roll or Manual to
create a manual roll.
From the Circuit Type drop-down list, choose Dual to indicate that you want to roll two connections
on the chosen circuit.
DLP- D236 Roll Two Cross-Connects on One Optical Circuit Using Automatic Routing
5, click the roll on the Rolls tab and click Complete to route the traffic
Step
(Figure
Cisco ONS 15454 SDH Procedure Guide, R7.0
13.
19-10):
19-35