hit counter script

Powering Up The Replaced Fabric Card - Cisco CRS-1 - Carrier Routing System Router Migration Manual

Carrier routing system
Hide thumbs Also See for CRS-1 - Carrier Routing System Router:
Table of Contents

Advertisement

Chapter 1
Migrating to a Cisco CRS-3 Carrier Routing System
Hardware Requirements
Restrictions
None.
SUMMARY STEPS
1.
2.
3.
4.
5.
6.
RP/0/RP0/CPU0:router#admin
RP/0/RP0/CPU0:router(admin)#config
RP/0/RP0/CPU0:router(admin-config)#hw-module power disable loc 0/SM0/SP
RP/0/RP0/CPU0:router(admin-config)#commit
RP/0/RP0/CPU0:router(admin)#show platform
Node
<snip>
0/SM0/SP
0/SM1/SP
0/SM2/SP
0/SM3/SP
0/SM4/SP
0/SM5/SP
0/SM6/SP
0/SM7/SP
<snip>

Powering up the Replaced Fabric Card

This section describes how to enable power back to the Fabric node, and verify that node is moved to
Powered state.
Prerequisites
Software Requirements
OL-13669-03
The Fabric card to be added must be prepared as described in the
Cisco CRS-3 Carrier Routing System" section on page
admin
configure
hw-module power disable loc 0/SM0/SP
commit
Verify that power has been removed from the Fabric Node (state is UNPOWERED).
show platform
Type
FC/S(SP)
FC/S(SP)
FC/S(SP)
FC/S(SP)
FC/S(SP)
FC/S(SP)
FC/S(SP)
FC/S(SP)
Cisco IOS XR Software Release 4.0.0.T or later release (Cisco IOS XR Software Release 4.0.2 for
multishelf nodes)
ROMMON 1.54 or later version
Cisco CRS-1 Carrier Routing System to Cisco CRS-3 Carrier Routing System Migration Guide
How to Migrate to a Cisco CRS-3 Carrier Routing System (8-Slot)
1-2.
PLIM
State
N/A
UNPOWERED
N/A
IOS XR RUN
N/A
IOS XR RUN
N/A
IOS XR RUN
N/A
IOS XR RUN
N/A
IOS XR RUN
N/A
IOS XR RUN
N/A
IOS XR RUN
"Prerequisites for Upgrading to a
Config State
PWR,NSHUT,MON
PWR,NSHUT,MON
PWR,NSHUT,MON
PWR,NSHUT,MON
PWR,NSHUT,MON
PWR,NSHUT,MON
PWR,NSHUT,MON
PWR,NSHUT,MON
1-53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Crs-3

Table of Contents