Chapter 3
Installing Cisco uBR7100 Series Universal Broadband Routers
Connect the opposite end of the grounding wire to the appropriate grounding point at your site to ensure
Step 7
an adequate chassis ground.
Attaching the Cable-Management Bracket
To install the cable-management bracket on the router, complete the following steps:
Locate the chassis grounding receptacles on the rear sides of the chassis. (See
Step 1
Note
Align the cable-management bracket to the vacant receptacles. Ensure that the two flanges on the bracket
Step 2
are facing away from the chassis.
Thread two 3.5 x 7-mm slotted hexhead screws through the bracket and into the chassis. Use a flat-head
Step 3
screwdriver to tighten the screws. Use tie wraps to secure interface cables to the bracket flanges.
Figure 3-8
Cisco uBR7114E chassis; the Cisco uBR7111 or Cisco uBR7111E chassis is identical.
Figure 3-8
Screws
As you connect the interface cables, carefully lace each cable through the cable-management bracket as
Step 4
needed.
This completes the steps for installing the cable-management bracket on a Cisco uBR7100 series router.
OL-5916-01
Both rear sides of Cisco uBR7100 series chassis have two grounding receptacles. Attach the
cable-management bracket to the two grounding receptacles that were not used to ground the
chassis in the
"Attaching the System Ground Connection" section on page
shows how to attach the cable-management brackets to the Cisco uBR7114 or
Attaching the Cable-Management Bracket to the Chassis (Cisco uBR7114 chassis)
5
DS0
I
FE 0/0
RF
DS0
US3
US2
Cable-management
bracket
Cisco uBR7100 Series and Cisco uBR7100E Series Universal Broadband Router Hardware Installation Guide
Chassis grounding receptacles
SLOT 0
SLOT 1
ACT ACT
PWR
PWR
LNK
FE 0/1
1
SYS
CONS
AUX
RDY
US1
US0
EN
uBR711 4
Attaching the Cable-Management Bracket
Figure
3-8.)
3-5.
Grounding lug
Grounding wire
3-7