7.
Lift the server chassis and insert into the rack rail.
•
•
•
Ensure to include the side knots on the two sides of the server in the rack rail holders.
The illustrations shown above are for reference only.
3-4
Ensure that the rack rail cabinet and the rack posts are stable and standing firmly on a
level surface.
We strongly recommend that at least two able-bodied persons perform the steps
described in this guide.
We recommend the use an appropriate lifting tool or device, if necessary.
1
2
1
2
1
2
1
2
Chapter 3: Installation options