hit counter script

Asus RS720Q-E8-RS12 User Manual page 34

2u rackmount server
Table of Contents

Advertisement

11.
Push down the right load lever (K) then
insert it under the retention tab (L).
12.
Apply some Thermal Interface Material
to the exposed area of the CPU that the
heatsink will be in contact with, ensuring
that it is spread in an even thin layer.
Some heatsinks come with pre-applied
thermal paste. If so, skip this step.
2-8
retention tab
Chapter 2: Hardware information
Load lever

Advertisement

Table of Contents
loading

Table of Contents