hit counter script

Air Flow Guidelines - Cisco XR 12410 Installation Manual

Xr 12410 router
Hide thumbs Also See for XR 12410:
Table of Contents

Advertisement

Site Requirement Guidelines

Air Flow Guidelines

Cisco XR 12410 Router Installation Guide
2-12
Cool air is circulated through the router by the blower module located at the top
of the chassis. The blower module maintains acceptable operating temperatures
for the internal components by drawing in cool air through the air filter in front of
the switch fabric and alarm card cage, and circulating the air through both card
cages
(Figure
2-6). Each power supply is also equipped with a fan that draws
cooler air into the front of the power supply and forces warmer air out of the back
of the chassis.
Figure 2-6
Air Flow Path through the Router—Side View
Blower module
Air filter
Room air
When selecting a site to install the router, observe the following guidelines:
Dust free area—The site should be as dust free as possible. Dusty
environments can clog the air filter or power supply intake vents, reducing the
cooling air flow through the router. Clogged filters and vents can cause an
overtemperature condition in the router.
Chapter 2
Preparing for Installation
Air exhaust
Line card and RP card cage
Switch fabric card cage
Power supplies
OL-13832-01

Advertisement

Table of Contents
loading

Table of Contents