hit counter script

Chapter 2 Preparing For Installation; Tools And Parts Required - Cisco ubr7111e Hardware Installation Manual

Universal broadband router
Hide thumbs Also See for ubr7111e:
Table of Contents

Advertisement

Preparing for Installation
This chapter describes the tasks you must perform before you begin to install a Cisco uBR7100 series
router and includes the following sections:
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Read the installation instructions before connecting the system to the power source. Statement 1004
Warning

Tools and Parts Required

Cisco uBR7100 series routers are fully assembled at the factory; no additional assembly is required prior
to installing the router. The following tools and parts are shipped with Cisco uBR7100 series routers
(unless noted otherwise) and are required for installation:
OL-5916-01
Tools and Parts Required, page 2-1
Shipping Container Contents, page 2-2
Safety Guidelines, page 2-3
Site Requirement Guidelines, page 2-6
Electrostatic discharge (ESD)-preventive wrist strap (not included with the router)
Number 2 Phillips screwdriver (not included with the router)
Flat-head screwdriver (not included with the router)
Rack-mount and cable-management kit for 19- inch, four-post or telco-type rack installation
(mounting brackets for a 23- or 24-inch rack are available separately)
Rubber feet for desktop installation
One double ground lug and two 3.5 x 8-mm screws for grounding the chassis. This optional
procedure also requires a 6-AWG grounding wire, a crimping tool suitable for the wire, and a knife
or wire stripper.
Cisco uBR7100 Series and Cisco uBR7100E Series Universal Broadband Router Hardware Installation Guide
C H A P T E R
2
2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ubr7114Ubr7111Ubr7100 seriesUbr7100e seriesUbr7114e

Table of Contents