hit counter script

Outdoor Unit - Pioneer QUANTUM INVERTER Series Service & Troubleshooting Manual

Hide thumbs Also See for QUANTUM INVERTER Series:
Table of Contents

Advertisement

3.2

Outdoor Unit

Evacuation for the Whole System:
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the vacuum pump to the 3-way valve' s
service port.
3.
Evacuate the system for approximately one hour.
Confirm that the compound meter indicates
-0.1 MPa (14.5Psi).
4.
Close the valve (Low side) on the charge set and turn
off the vacuum pump.
5.
Wait for 5 minutes then check whether the gauge
needle moves after turning off the vacuum pump. If
the gauge needle moves backward, check whether
there is gas leakage.
6.
Disconnect the charge hose from the vacuum pump.
7.
Mount the caps of service port and 2- and 3-way
valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18 N.m. (13.28 ft-lb).
Maintenance
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents