hit counter script

Re-Installation; Indoor Unit - Pioneer QUANTUM INVERTER Series Service & Troubleshooting Manual

Hide thumbs Also See for QUANTUM INVERTER Series:
Table of Contents

Advertisement

3. Re-Installation

3.1

Indoor Unit

Capturing the refrigerant into the outdoor unit:
Procedure:
1.
Confirm that the 2- and 3-way valves are opened.
2.
Connect the charge hose with the push pin of Handle
Lo to the 3-way valve' s gas service port.
3.
Open the Handle Lo manifold valve to purge air
from the charge hose for 5 seconds and then close it
quickly.
4.
Close the 2-way valve.
5.
Operate the air conditioner in cooling mode. Cease
operations when the gauge reaches 0.1 MPa (14.5
Psi).
6.
Close the 3-way valve so that the gauge rests
between 0.3 MPa (43.5 Psi) and 0.5 MPa (72.5 Psi).
7.
Disconnect the charge set and mount the caps of
service port and 2- and 3-way valves.
8.
Use a torque wrench to tighten the caps to a torque
of 18 N.m. (13.28 ft-lb).
9.
Check for gas leakage.
Maintenance
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents