Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
Copying the Configuration File Using a PC
Complete the following steps to copy the router's configuration file to a text file on a PC connected to
the router's console port.
Connect a serial port on the PC to the router's console port. Start a terminal program on the PC and
Step 1
configure it for the same baud rate, parity, and stop-bits that the console port is using.
Turn on the terminal program's capture buffer so that it will save all output to a text file.
Step 2
Enter the show startup-config command in privileged EXEC mode to display the router's startup
Step 3
configuration.
Note
When the router has completed displaying the configuration, turn off the terminal program's capture
Step 4
buffer and save the configuration file to the disk on the PC.
Step 5
(Optional) Use a text editor on the PC to modify the configuration, as needed.
This completes the procedure for copying the configuration file to a PC. Proceed to
Network Processing Engine" section on page
Removing the Network Processing Engine
Before you begin any removal or installation procedure, read
To install the NPE-G1 or NPE-G2, follow the instructions in this chapter for removal of an existing
network processing engine or network services engine and installation of the NPE-G1 or NPE-G2.
If you are removing the I/O controller, and do not plan to replace it, you must install an I/O controller
Note
blank panel (Cisco Product Number IO-CONTROLR-BLANK=) in the I/O controller slot. See the
Input/Output Controller Replacement Instructions
installing an I/O controller blank panel.
If you are installing a Port Adapter Jacket Card, see the
installation information.
OL-4448-12
Refer to the appropriate software documentation listed in the
on page iii
for descriptions of the configuration options available for the system and individual
interfaces, and for specific configuration instructions.
Network Processing Engine and Network Services Engine Installation and Configuration
Removing the Network Processing Engine
"Related Documentation" section
7-7.
Chapter 8, "Preparation for Installation."
for information on removing an I/O controller and
Port Adapter Jacket Card Installation Guide
"Removing the
for
7-7