hit counter script

Installing The Rear Cable-Management Brackets On A Front-Mounted Router (Optional) - Cisco NPE-175 Installation And Configuration Manual

Network processing engine and network services engine
Table of Contents

Advertisement

Chapter 7
NPE-G1 and NPE-G2 Installation and Configuration Information
Loosen the left and right captive installation screws on the NPE-G1 or NPE-G2.
Step 1
Hold the cable-management bracket so that it is positioned above the NPE-G1 or NPE-G2 captive
Step 2
installation screws as shown in
the horizontally-faced notch is at the left, the vertically-faced notch is at the right, and the bracket's outer
edge is flush with the edge on the NPE-G1 or NPE-G2. If you reverse the bracket so that it is not flush
with the NPE-G1 or NPE-G2, you will not be able to access the GBIC or SFP module connectors on the
NPE-G1 or NPE-G2 front panel.
Step 3
Slide the left end of the bracket between the captive installation screw and the front panel of the NPE-G1
or NPE-G2.
Rotate the cable-management bracket down, until its other notch slides behind the right captive
Step 4
installation screw. Make sure the bracket's outer edge is flush with the edge of the NPE-G1 or NPE-G2
and does not obstruct the GBIC or SFP ports.
Step 5
Tighten both captive installation screws.
Install the cables, and fasten them to the bracket with the velcro straps provided.
Step 6

Installing the Rear Cable-Management Brackets on a Front-Mounted Router (Optional)

Use the instructions in this section to attach the cable-management brackets to a front-mounted
Cisco 7200 VXR router.
OL-4448-12
Figure 7-17
and
Network Processing Engine and Network Services Engine Installation and Configuration
Figure
7-18. The bracket is properly positioned when
Installing the NPE-G1 or NPE-G2
7-31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF