hit counter script

Cisco Nexus 7710 Site Preparation And Hardware Installation Manual page 27

Table of Contents

Advertisement

Preparing the Site
3
4
5
6
7
8
Note
Figure 4: Clearances Required Around the Chassis, on page 14
conventional cold-aisle to hot-aisle systems which include rack enclosures with perforated front and rear
doors. The information given above does not apply to enclosures which have a solid rear or front door or wall
with other inlet or exhaust configurations. We recommend consulting a cooling professional if a solid rear or
front door is used.
OL-30452-01.
Vertical rack-mount posts and rails
Area used for fan tray handles at the rear
of the chassis (allow 2 inches [5 cm])
Nearest object or inside of cabinet (no
side clearance required)
Air intake from the cold aisle for all
modules and power supplies
Air exhaust to the hot aisle for all
modules and power supplies
No left side clearance required (no
airflow on left side)
Cisco Nexus 7710 Switch Site Preparation and Hardware Installation Guide
11
Rear service clearance required to replace fan trays
and fabric modules
12
Airflow clearance area required at the rear of the
chassis within the cabinet (if a cabinet is used)
13
Chassis depth.
The chassis depth will increase by 2
Note
inches when the 76mm Gen 2 fan tray
(N77-C7710-FAN-2) is used.
14
Clearance required between the front of the chassis
and the inside of the cabinet (if used) or the edge of
the cold aisle (if no cabinet) for the cable
management frames and the optional front doors
15
Front service clearance required for installing the
chassis and replacing the modules on the front of the
chassis
shows the clearance requirements for
Clearance Requirements
15

Advertisement

Table of Contents
loading

Table of Contents