Maintenance and Upgrade
For the Cisco 2130 and 2140, the input connector and plug must be UL recognized under UL 486 for field
wiring. The connection polarity is from left to right: negative (–), positive (+), and ground.
Use the handle on the power supply installation and removal. You must support the module with one hand
because of its length.
Figure 50: Firepower 2100 DC Power Supply Module
1
3
Before you begin
• The color coding of the DC input power supply leads depends on the color coding of the DC power
• Make sure that the chassis ground is connected on the chassis before you begin installing the DC power
Step 1
Verify that the power is off to the DC circuit on the power supply module that you are installing.
Step 2
While supporting the power supply module with one hand, insert the power supply module into the power supply bay
and gently push it in. See the illustration above for the location of the handle.
Step 3
Use a wire-stripping tool to strip each of the 2 wires coming from the DC input power source. Strip the wires to
approximately 0.39 inch (10 mm) + 0.02 inch (0.5 mm). We recommend you use 14 AWG insulated wire.
Handle
DC power connector
source at your site. Make sure that the lead color coding you choose for the DC input power supply
matches the lead color coding used at the DC power source and verify that the power source is connected
to the negative (–) terminal and to the positive (+) terminal on the power supply.
supply. See
Ground the Chassis, on page 62
Connect the DC Power Supply Module
2
FAIL and OK LEDs
4
Ejector latch
for the procedure.
Cisco Firepower 2100 Series Hardware Installation Guide
71