hit counter script

Commissioning; General Requirements - Siemens SITRANS FUE1010 IP65 NEMA 4X Operating Instructions Manual

Ultrasonic flowmeters
Table of Contents

Advertisement

Commissioning

6.1

General requirements

Before commissioning it must be checked that:
● The device has been installed and connected in accordance with the guidelines provided
in chapter 4 "Installing/mounting (Page 31)" and chapter 5 "Connecting (Page 35)"
● Device installed in hazardous location meets the requirements described in "Installation in
hazardous location (Page 14)"
Commissioning
Note
Refer to Programming the Transmitter (Page 49) if needed.
1. Scroll down to [Install Sensor] and press <Right Arrow>.
2. Scroll down to [Install Complete]. Press the <Right Arrow> and select [Install]. Press
<ENTER>. The flow meter will go through its drives.
FUE1010 IP65 NEMA 4X
Operating Instructions, 12/2014, A5E03086491-AC
6
87

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitrans 7me3500

Table of Contents