Installing the Supervisor in the Cisco cBR Chassis
Required Tools and Equipment
• ESD-preventive wrist strap
• Supervisor PIC or blank PIC for the Supervisor
• 3/16" flat-blade torque screwdriver
Step 1
Grasp the faceplate of the PIC with one hand and place your other hand under the PIC to support its weight.
Step 2
Carefully align the PIC with the plastic guides in the slot.
Step 3
Slide the PIC into the slot applying even pressure using both your hands until it is within an inch of full insertion.
Step 4
Open the ejector levers and fully insert the PIC into the slot applying even pressure on both sides until it mates with the
midplane connectors.
In the Cisco cBR-8 router,
Note
• Slot 4/1 for the Supervisor PIC corresponds to slot SUP0 for the Supervisor Card.
• Slot 5/1 for the Supervisor PIC corresponds to slot SUP1 for the Supervisor Card.
Installing the Supervisor PIC in the Cisco cBR Chassis
Cisco Converged Broadband Routers Hardware Installation Guide
39