hit counter script

Cisco cBR Hardware Installation Manual page 2

Converged broadband routers
Hide thumbs Also See for cBR:
Table of Contents

Advertisement

Installing the Supervisor PIC in the Cisco cBR Chassis
• Be aware of the weight and size of the equipment. Handle it with care.
Restrictions
• If you are using a single Supervisor, you must install the Supervisor PIC in the slot corresponding to
Required Tools and Equipment
• ESD-preventive wrist strap
• Supervisor PIC or blank PIC for the Supervisor
• 3/16" flat-blade torque screwdriver
Step 1
Grasp the faceplate of the PIC with one hand and place your other hand under the PIC to support its weight.
Step 2
Carefully align the PIC with the plastic guides in the slot.
Step 3
Slide the PIC into the slot applying even pressure using both your hands until it is within an inch of full insertion.
Step 4
Open the ejector levers and fully insert the PIC into the slot applying even pressure on both sides until it mates with the
midplane connectors.
Cisco Converged Broadband Routers Hardware Installation Guide
2
the Supervisor Card.
Note
In the Cisco cBR-8 router,
• Slot 4/1 for the Supervisor PIC corresponds to slot SUP0 for the Supervisor Card.
• Slot 5/1 for the Supervisor PIC corresponds to slot SUP1 for the Supervisor Card.
Installing the Supervisor in the Cisco cBR Chassis

Advertisement

Table of Contents
loading

Table of Contents