hit counter script

Rear View - Cisco RFGW-10 Hardware Installation Manual

Rf gateway 10
Hide thumbs Also See for RFGW-10:
Table of Contents

Advertisement

Chapter 3
Cisco RFGW-10 UEQAM Installation

Rear View

Figure 3-2
Figure 3-2
The internal fans draw cooling air into the chassis and across internal components to maintain an
acceptable operating temperature (see
fan tray module and power supply modules. A two-hole grounding lug is located on the rear left bottom
side of the chassis. Two DC PEMs are accessed from the rear of the router.
Note
You have already unpacked your chassis and read all the site requirements for your new equipment.
Proceed with the installation.
Warning
Before you install, operate, or service the system, read the Regulatory Compliance and Safety
Information for the Cisco RF Gateway 10 publication. This document provides important safety
information you should know before working with the system. Statement 200
Warning
This unit is intended for installation in restricted access areas. A restricted access area can be
accessed only through the use of a special tool, lock and key, or other means of security.
Statement 1017
Only trained and qualified personnel should be allowed to install, replace, or service
Warning
this equipment. Statement 1030
OL-16264-04
shows the rear of the Cisco RFGW-10 UEQAM with DC PEM installed.
Cisco RFGW-10 UEQAM
Rear View
Figure
3-2). The fans are located at the rear of the chassis in the
Cisco RF Gateway 10 Hardware Installation Guide
Cisco RFGW-10 UEQAM Description
3-3

Advertisement

Table of Contents
loading

Table of Contents