DLP-L18 Connecting Office Power (AC) to the NCS 2006 Shelf

Step 2
Depending on the shelf and the power module installed, complete the necessary task:
Step 3
Connect the office ground to the NCS 2006 shelf. For detailed instructions on grounding, see the
Discharge and Grounding Guide for Cisco NCS 2000
Step 4
Complete the
Step 5
Continue with the
Stop. You have completed this procedure.
DLP-L18 Connecting Office Power (AC) to the NCS 2006 Shelf
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Cisco NCS 2000 Series Hardware Installation Guide
204
DLP-L22 Turning On and Verifying DC Office Power on the NCS 2006 Shelf, on page
NTP-L11 Installing the Fan-Tray Assembly in the NCS 2006 Shelf, on page
Connecting Power and Ground
Series.
This task connects AC power to the NCS 2006 shelf.
• #2 Phillips Dynamometric screwdriver
• Medium slot-head screwdriver
• Small slot-head screwdriver
• Wire wrapper
• Wire cutters
• Wire strippers
• Crimp tool
• Fuse panel
• Ground cable 13.3-mm² (#6 AWG) stranded.
NTP-L2 Mounting the Brackets in ANSI
Configuration , on page
NTP-L5 Opening and Removing the Standard
Door of the NCS 2006 Shelf , on page
• Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, see the
Electrostatic Discharge and
Grounding Guide for Cisco NCS 2000 Series
Required
Onsite
None
Electrostatic
218.
296.
163.
252.
.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 2002Ncs 201

Table of Contents