Sign In
Upload
Manuals
Brands
Siemens Manuals
Switch
NXPLUS C
Siemens NXPLUS C Manuals
Manuals and User Guides for Siemens NXPLUS C. We have
3
Siemens NXPLUS C manuals available for free PDF download: Installation And Operating Instructions Manual
Siemens NXPLUS C Installation And Operating Instructions Manual (293 pages)
Medium-Voltage Switchgear, Fixed-Mounted Circuit-Breaker Switchgear up to 24 kV, Extendable, Single Busbar, Metal-Enclosed, Gas-Insulated
Brand:
Siemens
| Category:
Circuit breakers
| Size: 28.04 MB
Table of Contents
Table of Contents
3
1 Signal Terms and Definitions
6
2 General Instructions
6
Safety Instructions
6
3 Security
8
4 Due Application
9
5 Qualified Personnel
9
6 Features
10
7 Panel Types
12
Circuit-Breaker Panels
13
8 Examples for Panel Versions
13
Disconnector Panels
17
Bus Sectionalizer
19
Switch-Disconnector Panel
21
Vacuum Contactor Panel
22
Metering Panel
23
Ring-Main Panel
23
Circuit-Breaker
24
9 Components
24
Vacuum Contactor
25
Three-Position Disconnector
26
Three-Position Switch-Disconnector
26
Operating Mechanisms for Three-Position Switch
27
Voltage Transformers 4MT
28
Current Transformers 4MC
31
HV HRC Fuse Assembly
32
Busbar System
33
Cable Connection
34
Ready-For-Service Indicator
52
Interlocks
53
Accessories
54
Voltage Detecting Systems
54
Complete Switchgear
58
10 Technical Data
58
Iec 62271-200
59
Standards, Specifications, Guidelines
60
Selection of HV HRC Fuse-Links
61
Motor Protection Table (with HV HRC Fuses Make SIBA)
70
Fuse Protection Table for Metering Panel (with HV HRC Fuse-Links Make SIBA)
71
Rating Plates
72
Vacuum Circuit-Breaker
72
Three-Position Disconnector for Circuit-Breaker, Disconnector and Bus Sectionalizer Panels ≥ 1000 a
76
Three-Position Switch-Disconnector for Switch-Disconnector Panels, Ring-Main Panels and Circuit-Breaker Panels up to 630 A, Vacuum Contactor Panel and Metering Panel
76
10.11 Endurance Classes
77
Vacuum Contactor
78
10.13 Insulating Gas
79
11 End of Life
80
12 Constructional Stipulations
81
Installation
81
Switchgear Room
81
Constructional Data of the Foundation
84
Transport Units
94
13 Before Installation
96
Intermediate Storage
96
Preliminary Clarifications
96
Tools/Auxiliary Means
97
Comments on Electromagnetic Compatibility
98
Completeness and Transport Damages
100
Packing and Transport Unit
100
14 Unloading and Erecting the Switchgear
100
Unloading and Transporting to Place of Installation
101
Checking the Ready-For-Service Indicator
105
15 Assembling the Switchgear
107
Aligning and Joining the Panels
108
Fastening the Panel to the Foundation
110
Removing Transport Braces
110
Assembling the Busbars
111
Mounting the Busbar Support
122
Installi Ng Current Transformers on the Busbar
124
Installing Busbar Voltage Transformers
127
Interconnecting the Earthing Busbars
132
Switchgear Earthing
132
15.10 Installing the Low-Voltage Compartment
133
15.11 Installing the Horizontal Pressure Relief Duct
134
15.12 Installing the Switchgear Termination
143
15.13 Mounting the Busbar Covers
144
15.14 Mounting the Air Guides
151
15.15 Extension with Individual Panels
154
16 Electrical Connections
154
Installation Work at the Floor Cover
155
Connecting Cable T-Plugs
158
Panels 2000 A, 2500 a with Double Connections
163
Connecting Surge Arresters
164
Connecting Surge Limiters
165
Connecting Auxiliary Circuits
166
17 Installation of Degree of Protection Versions IP31D, IP32D and IP34D
171
IP31D - Protection against Vertically Falling Water Drops
171
IP32D - Protection against Vertically Falling Water Drops for Switchgear Inclined up to 15
175
IP34D - Protection against Splashing Water from any Direction
176
18 Commissioning
177
Final Work
177
Checking the Accessories
179
Function Test / Test Operation
179
Instructing Operating Personnel
179
Performing the Power- Frequency Voltage Test
183
Applying Operating Voltage
184
Correcting Circuit Diagrams
184
Primary Injection Test
184
Operation
186
19 Control Elements and Indicators
187
Operations Counter
188
Position Indicators
188
Spring Charged" Indicator
188
Circuit-Breaker Locking Device for "Feeder Earthed
189
Ready-For-Service Indicator
189
Charging the Closing Spring
190
Closing the Circuit-Breaker
190
Opening the Circuit-Breaker
190
20 Operating the Circuit-Breaker
190
Circuit-Breaker Test Operation
191
21 Operating the Three-Position Switch
192
Closing the Three-Position Switch
193
Opening the Three-Position Switch
193
De-Earthing with the Three-Position Switch
194
Earthing/Ready-To-Earth with the Three-Position Switch
194
Operating the Three-Position Switch with Motor-Operating Mechanism
195
Protection Tripping of the Switch-Fuse Combination
195
Emergency Operation of the Three-Position Switch with Slow Motion Mechanism (900 MM Panel Width)
196
22 Work-In-Progress Earthing
201
LRM Plug-In Sockets
203
23 Verification of Safe Isolation from Supply
203
VOIS and CAPDIS Indications
205
WEGA Indications
207
24 Replacing HV HRC Fuse-Links
208
Disconnecting the Feeder Voltage Transformer
212
25 Operating the Feeder Voltage Transformer
212
Connecting the Feeder Voltage Transformer
213
Operating Circuit-Breaker Panels (600 MM Panel Width)
214
26 Short Instructions
214
Operating Circuit Breaker Panels (900 MM Panel Width)
220
Operating Vacuum Contactor Panels
226
Operating Switch-Disconnector, Disconnector, Ring-Main and Metering Panels with 600 MM Panel Width
230
Operating Disconnector Panels as of 2000 a (900 MM Panel Width)
234
Operating Bus Sectionalizer Panels with 600 MM Panel Width
238
Operating Bus Sectionalizer Panels with 900 MM Panel Width
242
Operating Bus Sectionalizer Panels with Two Three-Position Disconnectors and with 600 MM Panel Width
246
Operating Bus Sectionalizer Panels with Two Three-Position Disconnectors and with 900 MM Panel Width
253
26.10 Operating the Circuit-Breaker Panel with Busbar Earthing Switch
261
27 Cable Testing
266
28 Maintenance
268
Maintenance of Circuit-Breaker 3AH25 with 30000 Operating Cycles
268
Service Information
268
29 Checks and Maintenance Work in Case of Special Operating Conditions
275
Visual Check at the Operating Mechanisms and the Three-Position Switches
276
Visual Check of Spring-Operated Mechanism
276
Visual Check of Slow Motion Mechanism
278
Visual Check of Spring-Operated/Stored-Energy Mechanism
279
Visual Check of Circuit-Breaker Operating Mechanism
281
Visual Check of Vacuum Contactor Operating Mechanism
282
Cleaning, Greasing and Lubricating the Operating Mechanisms
283
Test Operation of the Operating Mechanisms
283
30 Permissible Lubricants
284
(Motor Control Unit - Module Housing)
285
Annex
285
Application
285
Design, Function
285
Extract from the Technical Description
285
31 Extending the Switchgear or Replacing Panels and Components
284
32 Mcu-Mh
285
Fault Signals
286
Technical Data
286
Terminal Assignment of Motor Control Unit
287
Siemens Service Hotline
288
Index
289
Advertisement
Siemens NXPLUS C Installation And Operating Instructions Manual (266 pages)
Fixed-mounted circuit-breaker switchgear up to 38 kV, Extendable Single busbar, metal-enclosed, gas-insulated
Brand:
Siemens
| Category:
Circuit breakers
| Size: 27.24 MB
Table of Contents
Table of Contents
3
1 Signal Terms and Definitions
6
Safety Instructions
6
2 General Instructions
7
3 Security
9
4 Due Application
9
5 Qualified Personnel
9
6 Features
10
7 Panel Versions
11
Circuit-Breaker
15
8 Examples for Panel Versions
11
9 Components
15
Three-Position Disconnector
16
Three-Position Switch-Disconnector
16
Vacuum Contactor
16
Operating Mechanisms for Three-Position Switch
17
Voltage Transformers
18
Current Transformers
20
Busbar System
21
HV HRC Fuse Assembly
21
Cable Connection
22
Interlocks
34
Ready-For-Service Indicator
34
Voltage Detecting Systems
35
Accessories
36
General Technical Data
38
10 Technical Data
38
Circuit-Breaker Panel
39
Disconnector Panel
43
Switch-Disconnector Panel
43
Vacuum Contactor Panel with HV HRC Fuses
43
Auxiliary Transformer Panel with HV HRC Fuses
44
Bus Sectionalizer Panel
44
10.10 Ring-Main Panel
45
10.11 Current and Voltage Transformers
45
Classification of NXPLUS C According to
45
Iec 62271-200
45
Metering Panel (Air-Insulated)
45
Metering Panel (Gas-Insulated)
45
10.13 Standards, Specifications, Guidelines
46
10.14 Selection of HV HRC Fuse-Links
47
10.15 Insulating Gas
61
10.16 Rating Plates
62
11 End of Life
63
12 Building Codes
64
Installation
64
Switchgear Room
64
Construction Data for the Foundation
66
Transport Units
74
13 Before Installation
75
Intermediate Storage
75
Preliminary Clarifications
75
Tools and Auxiliary Means
76
Cleaning Agents and Cleaning Aids
77
Mounting Paste
77
Comments on Electromagnetic Compatibility
78
Tightening Torques
78
Completeness and Transport Damage
80
Packaging and Transport Unit
80
14 Unloading and Erecting the Switchgear
80
Unloading and Transporting to the Place of Installation
81
Checking Service Readiness
83
15 Assembling the Switchgear
84
Aligning and Joining the Panels
85
Fastening the Panel to the Foundation
87
Installing the Busbars
88
Removing Transport Braces
88
Installing the Busbar Support
99
Installing a Current Transformer on the Busbar
101
Installing a Voltage Transformer on the Busbar
102
Interconnecting the Earthing Busbars
109
15.10 Installing the Low-Voltage Compartment
110
Earthing the Switchgear
110
15.11 Installing the Horizontal Pressure Relief Duct
111
15.12 Installing the Switchgear Termination
121
15.13 Installing the Busbar Covers
122
15.14 Extension with Individual Panels
127
Installing Instrument Transformers in the Metering Panel
128
16 Installing the Air-Insulated Metering Panel
128
Replacing Instrument Transformers in the Air-Insulated Metering Panel
140
Mounting Earthing Accessories in the Air-Insulated Metering Panel
141
17 Installing the Auxiliary Transformer Panel
144
Mounting the Lateral Cable Connection
144
Installing the Transformer in the Auxiliary Transformer Panel
149
18 Electrical Connections
157
Installation Work at the Floor Cover
157
Connecting Cable T-Plugs
159
Installing the Surge Arresters
164
Installing the Surge Limiter
164
Connecting Auxiliary Circuits
165
19 Installation of the IP31D, IP32D and IP34D Degree of Protection Designs
170
IP31D - Protection against Vertically Falling Water Drops
170
IP32D - Protection against Vertically Falling Water Drops for Switchgear Inclined up to 15
173
IP34D - Protection against Splashing Water from any Direction
174
20 Commissioning
175
Final Work
175
Checking the Accessories
176
Instructing Operating Personnel
176
Functional Test/Test Operation
177
Performing the Power-Frequency Voltage Test
180
Correcting Circuit Diagrams
181
Primary Injection Test
181
Applying Operating Voltage
182
21 Recurring Activities
184
Removing and Mounting the
184
Removing and Mounting the Connection Compartment Covers
185
Operation
187
22 Control Elements and Indicators
188
Operations Counter
189
Position Indicators
189
Spring Charged" Indicator
189
Control Gate with Locking Device
190
Ready-For-Service Indicator
190
Circuit-Breaker Locking Device for "Feeder Earthed
191
Locking Device for Pushbutton
191
Service Flap
192
Operating Tools
193
Charging the Closing Spring
195
Closing the Circuit-Breaker
195
Opening the Circuit-Breaker
195
23 Operating the Circuit-Breaker
195
Circuit-Breaker Test Operation
196
24 Operating the Three-Position Disconnector
197
Switching the Three-Position Disconnector from CLOSED to OPEN Position
197
Switching the Three-Position Disconnector from OPEN to CLOSED Position
197
Switching the Three-Position Disconnector from OPEN to READY-TO-EARTH Position
198
Switching the Three-Position Disconnector from READY-TO-EARTH to OPEN Position
198
Emergency Operation of the Three-Position Switch with Slow Motion Mechanism
199
Operating the Three-Position Switch with Motor-Operating Mechanism
199
25 Operating the Three-Position Switch-Disconnector
202
Switching the Three-Position Switch-Disconnector from OPEN to CLOSED Position
202
Operating the Three-Position Switch with Motor-Operating Mechanism
203
Switching the Three-Position Switch-Disconnector from CLOSED to OPEN Position
203
Switching the Three-Position Switch-Disconnector from EARTHED to OPEN Position
203
Switching the Three-Position Switch-Disconnector from OPEN to EARTHED Position
203
Protection Tripping of the Switch-Fuse Combination
204
26 Work-In-Progress Earth
205
LRM Plug-In Sockets
207
27 Verification of Safe Isolation from Supply
207
VOIS and CAPDIS Indications
209
WEGA Indications
211
28 Replacing HV HRC Fuse-Links
212
29 Operating the Feeder Voltage Transformer
215
Switching off the Feeder Voltage Transformer
215
Switching on the Feeder Voltage Transformer
216
30 Short Instructions
217
Switching Circuit-Breaker Panels and Bus Sectionalizer Panels with One Three-Position Disconnector
217
Operating Vacuum Contactor Panels
223
Operating the Disconnector Panel
225
Operating Ring-Main Panels and Metering Panels (Gas-Insulated)
226
Operating the Bus Sectionalizer Panel with 2 Three-Position Disconnectors
229
Operating the Circuit-Breaker Panel with Busbar Earthing Switch
236
Switching the Air-Insulated Metering Panel with Two Three-Position Disconnectors
242
Operating the Auxiliary Transformer Panel and Switch-Disconnector Panel
246
31 Cable Testing
248
32 Maintenance
250
Service Information
250
33 Checks and Maintenance Work in Case of Special Operating Conditions
251
Checks on Three-Position Switch Operating Mechanisms
252
Visual Check of Circuit-Breaker Operating Mechanism
253
Connection Compartment Interlock Check
254
Visual Check of Vacuum Contactor Operating Mechanism
254
Fuse Tripping Check
255
Cleaning, Greasing and Lubricating the Operating Mechanisms
256
34 Permissible Lubricants
257
Test Operation of the Operating Mechanisms
257
(Motor Control Unit - Module Housing)
258
Annex
258
Application
258
Design, Function
258
Extract from the Technical Description
258
35 Extending the Switchgear or Replacing Panels and Components
257
36 Mcu-Mh
258
Fault Signals
259
Technical Data
259
Terminal Assignment of Motor Control Unit
260
Siemens Service Hotline
261
Index
262
Siemens NXPLUS C Installation And Operating Instructions Manual (172 pages)
Medium-Voltage Switchgear/Wind Fixed Mounted Circuit-Breaker Switchgear up to 36 kV, Extendable
Brand:
Siemens
| Category:
Switch
| Size: 6.45 MB
Table of Contents
Table of Contents
3
1 Signal Terms and Definitions
5
Safety Instructions
5
2 General Instructions
6
3 Due Application
7
4 Qualified Personnel
7
Description
8
5 Features
8
6 Panel Types
10
7 Examples for Panel Versions
11
Circuit-Breaker
13
8 Components
13
Three-Position Disconnector
15
Operating Mechanisms for the Three-Position Disconnector
16
Three-Position Switch-Disconnector
17
Operating Mechanisms of Three-Position Switch-Disconnectors
18
Voltage Transformers
19
Current Transformers
20
Busbar System
21
Cable Connection
22
Ready-For-Service Indicator
25
Interlocks
26
Voltage Detecting Systems
27
Short-Circuit/Earth-Fault Indicator (Ring-Main Panel)
31
Accessories
32
Complete Switchgear
36
9 Technical Data
36
Classification of NXPLUS C Wind According to
38
Standards, Specifications, Guidelines
39
Iec 62 271-200
40
Rating Plates
40
Vacuum Circuit-Breaker
41
Endurance Classes
44
Three-Position Disconnector for Circuit-Breaker Panels and Disconnector Panels 630 a / 800 a / 1000 a
44
Three-Position Switch-Disconnector
44
10 End of Service Life
46
11 Constructional Stipulations
47
Installation
47
Switchgear Room
47
Constructional Data of the Foundation
48
Transport Units
57
12 Before Installation
59
Intermediate Storage
59
Preliminary Clarifications
59
Installation and Fixing Material
60
Tools/Auxiliary Means
60
Comments on Electromagnetic Compatibility
61
Completeness and Transport Damages
62
Packing and Transport Unit
62
13 Unloading and Erecting the Switchgear
62
Transport to the Place of Installation (Switchgear Room)
63
Unloading Transport Units
63
Checking the Ready-For-Service Indicator
67
14 Assembling the Switchgear
69
Bolting Panels Together
69
Assembling the Busbars
72
Fastening the Switchgear to the Foundation
72
Installing Busbar Voltage Transformers
80
Installing the Earthing Busbar
88
Switchgear Earthing
89
Busbar Covers
90
Installing Low-Voltage Compartments
90
14.10 Extension with Individual Panels
91
Installing the Switchgear Termination
91
15 Electrical Connections
93
Installation Work at the Pressure-Resistant Floor Cover
93
Connecting Cable T-Plugs
99
Cable Connection with Cable-Type Current Transformers
105
Connecting Surge Arresters
108
Connecting Auxiliary Circuits
109
16 Installation of Designs with Degree of Protection IP31D (Low-Voltage Compartment)
114
IP31D - Protection against Vertically Falling Water Drops
114
17 Commissioning
118
Final Work
118
Checking the Accessories
120
Function Test / Test Operation
120
Instructing Operating Personnel
120
Performing the Power- Frequency Voltage Test
126
Applying Operating Voltage (High Voltage)
127
Primary Injection Test
127
18 Indicators and Control Elements
129
Operation
129
19 Checking the Ready-For-Service Indicator
132
Closing the Circuit-Breaker
133
Opening the Circuit-Breaker
133
20 Operating the Circuit-Breaker
133
Test Operation
133
Test Operation with Auxiliary Voltage (Motor Operating Mechanism)
134
Charging the Closing Spring Manually with the Hand Crank
135
Operating Levers for Three-Position Disconnector
136
21 Operating the Three-Position Disconnector
136
Closing the Three-Position Disconnector
137
Opening the Three-Position Disconnector
137
De-Earthing with the Three-Position Switch
138
Earthing/Ready-To-Earth with the Three-Position Switch
138
Emergency Operation of the Three-Position Disconnector
139
Operating the Three-Position Disconnector with Motor Operating Mechanism
139
Closing the Three-Position Switch-Disconnector
145
Operating Lever for Three-Position Switch-Disconnector (with Adapter)
145
22 Operating the Three-Position Switch-Disconnector
145
Opening the Three-Position Switch-Disconnector
146
Earthing the Three-Position Switch-Disconnector
147
De-Earthing with Three-Position Disconnector
148
Operating Three-Position Switch-Disconnector with Motor Operating Mechanism
149
23 Work-In-Progress Earthing
150
LRM Plug-In Sockets
152
24 Verification of Safe Isolation from Supply
152
Capdis -S1+/-S2
153
Indications VOIS, VOIS R
154
Indications WEGA 1.2, WEGA 2.2
155
25 Short Instructions
156
Operating Circuit-Breaker Panels
157
Operating Disconnector Panels
160
26 Cable Testing
166
Maintenance
168
27 Service Instructions
168
Switchgear Extension and Replacement of Panels and Components
168
Index
169
Advertisement
Advertisement
Related Products
Siemens NCM S7
Siemens NXAIR P
Siemens NXAirS
Siemens ACUSON NX3 series
Siemens ACUSON NX2
Siemens l-T-E NXD6
Siemens NXAIR M
Siemens NXAIR
Siemens NK8222
Siemens 15-FSV-1000
Siemens Categories
Industrial Equipment
Controller
Control Unit
Oven
Washer
More Siemens Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL