The Y-cables are not required; two individual console cables and two individual auxiliary cables can be
Note
used instead.
Figure 6
Figure 6
DB-25 female
Figure 7
DB-25 male
Restarting the System
When you turn the system power back on, verify that the system boots and resumes normal operation. If
you are restarting the system after upgrading the DRAM, expect that it will take the system longer to
complete the memory initialization portion of the boot sequence with more DRAM. (See the
System Startup Sequence" section on page
Follow these steps to verify that the RSP8 is installed and functioning properly:
Check the RSP8 connections to make sure they are secure:
Step 1
•
•
Observe the RSP8 LEDs. While the system initializes, the CPU halt LED on the RSP8 stays on. It goes
Step 2
off when the boot process is complete. As the RSP8 initializes each interface processor, the status LEDs
on each interface processor go on and off in irregular sequence.
OL-4920-02
shows the console Y-cable and
Console Y-Cable (Part Number CAB-RSP8CON=)
To console terminal
Auxiliary Y-Cable (Part Number CAB-RSP8AUX=)
To external
auxiliary equipment
The RSP8 is inserted all the way into its slot, and both captive installation screws are tightened.
The console terminal is turned on and is connected to the console port.
Figure 7
shows the auxiliary Y-cable.
DB-25 female
Auxiliary connectors
to auxiliary ports on two
RSP8s in RSP slots
DB-25 female
66.)
Route Switch Processor (RSP8) Installation and Configuration Guide
Installing the RSP8
DB-25 male
Console connectors
to console ports on two
RSP8s in RSP slots
DB-25 male
"Verifying
21