Foundation
Regulations and
standards referred to
foundation and
switchgear room
Dimensions
864-5091.9 • INSTALLATION AND OPERATING INSTRUCTIONS • 8DB10 • Revision 06
Please observe the following items when preparing the foundation:
• Dimensions of the floor opening and the fixing points of the switchgear frame
(see page 53, "Constructional data of the foundation").
• Determine level differences between the installation surfaces of the panels using
a measuring sheet, and compensate them with shims (0.5 - 1.0 mm).
Fig. 50:
Measuring sheet for the foundation
The measuring sheet for the foundation shows: Evenness/straightness tolerance according to
DIN 4366: 1 mm for 1 m length, 2 mm for the total length.
The switchgear can be used as indoor installation according to IEC 61 936 (Power Installations
exceeding 1 kV AC) and VDE 0101
• outside lockable electrical service locations at places which are not accessible to the public.
Enclosures of switchgear can only be removed with tools
• in lockable electrical service locations. A lockable electrical service location is a place
outdoors or indoors that is reserved exclusively for housing electrical equipment and
which is kept under lock and key. Access is restricted to authorized personnel and persons
who have been properly instructed in electrical engineering
For more information, see page 46, "Standards, specifications, guidelines".
19.3
Transport units
Panel widths
Transport dimensions
mm
Width x Height x Depth
mm x mm x mm
Transport inside Germany or to European countries
1 x 600
1816 x 2550 x 3124
2 x 600
1816 x 2550 x 3124
3 x 600
2416 x 2550 x 3124
Transport to overseas
1 x 600
1840 x 2850 x 3124
2 x 600
1840 x 2850 x 3124
3 x 600
2440 x 2850 x 3124
1)
Average values depending on the degree to which panels are equipped
Transport weight with
Transport weight
1)
packing
without packing
approx. kg
approx. kg
1300
1200
2600
2400
3900
3600
1300
1200
2600
2400
3900
3600