hit counter script

Assembling; Preparations For Installation; Requirements For Installation - Siemens SIMOTICS DC 1GG6 Operating And Installation Instructions

Dc motor
Table of Contents

Advertisement

Assembling

When carrying out any work on the machine, observe the general safety instructions
(Page 15) and the specifications contained in EN 50110‑1 regarding safe operation of electrical
equipment.
5.1

Preparations for installation

5.1.1

Requirements for installation

The following requirements must be satisfied prior to starting installation work:
● Staff have access to the operating and installation instructions.
● The machine is unpacked and ready for mounting at the installation location.
NOTICE
High temperatures
The motor components get very hot during operation. High temperatures can damage
mounting parts such as the cable insulation.
● Temperature-sensitive parts such as normal cables or electronic components must not
● Only use heat-resistant mounting parts. The connecting cables and cable entries must be
Note
Loss of conformity with European directives
In the delivery state, the machine corresponds to the requirements of the European directives.
Unauthorized changes or modifications to the machine lead to the loss of conformity with
European directives and the loss of warranty.
SIMOTICS DC 1GG6
Operating Instructions 02/2016
Note
Measure the insulation resistance of the winding before starting installation work
Wherever possible, measure the insulation resistance of the winding before starting
installation work. If the insulation resistance lies below the specified value, take appropriate
remedial measures. These remedial measures may necessitate the machine being
removed again and transported.
rest against or be attached to mounted machine parts.
suitable for the ambient temperature.
5
35

Advertisement

Table of Contents
loading

Table of Contents