Page 3
Introduction Safety notes Description SIMOTICS DC Preparations for use DC motor 1GG5 Assembling Electrical connection Operating Instructions Installation Instructions Commissioning Operation Maintenance Spare Parts Disposal Service and Support Technical data and drawings Quality documents Checklists Edition 02/2016...
Page 4
Note the following: WARNING Siemens products may only be used for the applications described in the catalog and in the relevant technical documentation. If products and components from other manufacturers are used, these must be recommended or approved by Siemens. Proper transport, storage, installation, assembly, commissioning, operation and maintenance are required to ensure that the products operate safely and without any problems.
Requirements for safe lifting and transporting...............27 4.8.6 Transporting the machine set....................28 4.8.7 Lifting and transporting the machine..................28 4.8.8 Storage...........................30 4.8.9 Protection against corrosion....................32 Assembling..............................33 Preparations for installation....................33 5.1.1 Requirements for installation....................33 5.1.2 Insulation resistance and polarization index................34 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 6
Connecting temperature monitoring for the stator winding............58 6.11 Completing connection work....................59 Commissioning............................61 Preparing for commissioning....................61 Measure the insulation resistance before commissioning............62 Greasing the roller bearings prior to commissioning..............62 Minimum radial forces for cylindrical roller bearings..............63 Commissioning an external fan....................64 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 7
Touch up any damaged paintwork..................92 Repair.............................92 9.2.1 Prepare servicing work......................93 9.2.2 Disassembling the machine....................94 9.2.3 Removing rolling-contact bearings..................95 9.2.4 Installing the machine......................95 9.2.5 Mounting the rolling-contact bearings..................96 9.2.6 Replacing the speed encoder....................97 9.2.6.1 Speed sensor with conical hub....................97 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 8
Disposal of components.......................116 Service and Support..........................117 Technical data and drawings........................119 Tightening torques for screw and bolt connections..............119 Quality documents............................121 Checklists..............................123 Switching on.........................124 Commissioning........................125 Inspection at standstill......................126 Inspection when the motor is running..................127 Index.................................129 Tables SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 9
Table D-1 Items to check during switch-on....................124 Table D-2 Items to check during commissioning..................125 Table D-3 Items to inspect when machine is at standstill................126 Table D-4 Items to inspect when the motor is running................127 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 10
Speed sensor with conical hub for shaft heights 180 to 630.............112 Image 10-9 Speed sensor for overhung mounting for shaft heights 180 to 630..........113 Image 10-10 Speed sensor for construction type IM B5 for shaft heights 180 to 630........114 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
– Lists on the second level are hyphenated. Note A Note is an important item of information about the product, handling of the product or the relevant section of the document. Notes provide you with help or further suggestions/ideas. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 12
Introduction 1.1 About these instructions SIMOTICS DC 1GG5 Operating Instructions 02/2016...
EN 50110‑1 "Working in a voltage-free state". Apply the five safety rules in the sequence stated before starting work. Five safety rules 1. Disconnect the system. Also disconnect the auxiliary circuits, for example, anti-condensation heating. 2. Secure against reconnection. 3. Verify absence of operating voltage. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Always observe the “five safety rules" (Page 13) when carrying out any work on the machine. ● Only remove the covers using the methods described by these operating instructions. ● Operate the machine properly. ● Regularly and correctly maintain the machine. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 15
Burns and other damage to health and material may result. ● Read the information in these operating instructions and the product information supplied by the manufacturer. ● Observe the relevant safety regulations and wear the personal protective equipment specified. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Always place electrostatic sensitive devices on conductive bases. ● Always pack, store and transport electronic modules or components in conductive packaging, such as: – Metallized plastic or metal containers – Conductive foam material – Domestic aluminum foil SIMOTICS DC 1GG5 Operating Instructions 02/2016...
A strongly irregular torque, for example with the drive of a reciprocating motor, forces a non- sinusoidal motor current. The emerging harmonics can have an impermissible influence on the line power supply via the connection lines. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Protect the personnel working in the plant by taking appropriate measures, such as erecting identifying markings, safety barriers and warning signs and giving safety talks. ● Observe the nationally applicable health and safety regulations. ● Do not carry any magnetic or electronic data media. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
A separately-driven fan draws in and blows out the ambient air. Design The machine has no housing, but is designed with a fully laminated stator yoke which allows a rate of current change of up to 250 I /sec. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 20
Degree of protection IEC/EN 60034‑5 Cooling IEC/EN 60034‑6 Construction type IEC/EN 60034‑7 Terminal markings and direction of rotation IEC/EN 60034‑8 Noise emission IEC/EN 60034‑9 Vibration severity grades IEC/EN 60034‑14 Vibration limits DIN ISO 10816-3 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
The terminal box fulfills degree of protection IP55. The screw-mounted entry plate is not normally supplied with holes. This enables you to adapt the type, number, and size of the screw connections to the specific cabling requirements. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 22
The rolling-contact bearing is normally a floating bearing at the drive end and a locating bearing at the non-drive end. You will find further information in section "Spare parts (Page 103)." On machines with a regreasing device, the lubricant plate specifies the types of rolling-contact bearing fitted. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Take steps to reduce noise, such as introducing covers and protective insulation or adopting hearing protection measures, so that the machine can be operated safely within your system. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Excessive vibrations can damage the machine set. The vibration limit values according to DIN ISO 10816-3 must not be exceeded. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
No claims relating to defects/items missing from the delivery will be accepted if they are submitted at a later date. ● Report any apparent transport damage to the delivery agent immediately. ● Immediately report any apparent defects/missing components to your contact partner. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
If the load handling attachments and lifting gear are damaged or not correctly secured, the machine may be dropped during lifting. This can result in death, serious injury or material damage. Inspect the load handling attachments and lifting gear before use. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Always take account of the center of gravity when transporting or lifting the motor. If the center of gravity is not located centrally between the attachment points, then position the hoisting hook above the center of gravity. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
① ③ Sleeve Fixture ② ④ Coupling Shaft screw Image 4-1 Rotor shipping brace without coupling (1) and with coupling (2). SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 29
If the lifting gear or load handling attachments were to fail, the machine could fall. This can result in death, serious injury or material damage. Never remain under or in the immediate vicinity of the machine when it is raised. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Ensure that the air circulation under the equipment is not impeded. – Place wooden spacer blocks between the covers and the motor. – Covers or tarpaulins must not trail on the floor around the machine. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 31
(if available), and ensure that the air circulates in the storage room. Storage for longer than three months Lubricate the machine after every two years of storage. 1. Unpack the machine. 2. Remove the rotor shipping brace, if one is being used. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Inspect the machine regularly and apply an additional coating of corrosion protection if necessary. Document all preservation measures taken so that they can be reversed before the machines are put back into service. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
In the delivery state, the machine corresponds to the requirements of the European directives. Unauthorized changes or modifications to the machine lead to the loss of conformity with European directives and the loss of warranty. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Measure the insulation resistance 1. Before you begin measuring the insulation resistance, please read the operating manual for the insulation resistance meter you are going to use. 2. Make sure that no power cables are connected. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 35
In this case, doubling or halving the insulation resistance at a temperature change of 10 K is used as the basis. ● The insulation resistance halves every time the temperature rises by 10 K. ● The resistance doubles every time the temperature falls by 10 K. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 36
Limit values of the anti-condensation heating insulation resistance The insulation resistance of the anti-condensation heating with respect to the machine housing should not be lower than 1 MΩ when measured at 500 V DC. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Measuring the concentricity and axial eccentricity tolerances ● Positioning the machine If you are not familiar with the prescribed measures and procedures, then you can make use of the services offered by the local Service Center (Page 117). SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Failure to fit the rotor shipping brace can result in damage to the bearings while the machine is being turned onto its side. Fix the rotor in place before you turn the machine into a horizontal position. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
If you use metal objects such as scrapers, spatulas, or plates to remove the anti-corrosion protection, this could result in damage to the surfaces of the machine parts. ● Lightly oil the depreserved surfaces. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
The transmission element must be pulled on in one continuous operation via the front thread holes in the shaft or pushed on by hand. – Do not strike it with a hammer, as this would damage the bearings. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
– Do not exceed the maximum lifting acceleration and lifting speed specified on the lifting plate. Lift the machine without jerking it. Acceleration a ≤ 0.4 g (≈ 4 m/s Velocity v ≤ 20 m/min ● Use only the load carrying device on the stator frame for lifting. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 42
If the lifting gear or load handling attachments were to fail, the machine could fall. This can result in death, serious injury or material damage. Never remain under or in the immediate vicinity of the machine when it is raised. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
The transmission element such as a coupling half has already been pulled on. Roughly aligning the machine ● For horizontal positioning, push the motor sideways across the foundation. When doing so, ensure that the axial position is maintained. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Installing the machine Note Service Center For any installation work that is required, contact the Service Center (Page 117) or commission service engineers trained by Siemens and authorized for this task. 5.3.1 Safety instructions for installation WARNING Inappropriate fastening material If screws of an incorrect property class have been selected or if they have been fastened to an incorrect tightening torque, they may break or become loose.
The balance state of the shaft (full-key or half-key balancing) and alignment errors primarily influence the service life of the bearing, especially for high motor speeds or when using rigid couplings. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
1500 rpm < n ≤ 3600 rpm = 0.05 mm = 0.05 mm / 100 mm ∅ D Note Machine expansion When performing alignment, make allowance for the thermal expansion of the machine due to rising temperature. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
The standard flange is provided with a centering. The choice of fit for the mating flange on the driven machine is the system manufacturer's or the plant operator's responsibility. Note If the machine is not fitted with a standard flange, align the machine to suit the driven machine. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
0.05 mm in diameter. 5.3.8 Axial and radial forces You can obtain the permissible values for axial and radial forces by contacting the Siemens Service Center (Page 117) or referring to the machine catalog. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● In the case of motors with a built-on external fan or with an air-to-air or air-to-water heat exchanger, the relevant operating instructions must be observed. ● Do not use materials containing silicone to seal the air inlet ducts and machine elements. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 50
● Please observe the following for side-mounted external fans: – External fans are supplied separately. – Do not mount the external fan until the foot bolts have been finally tightened. – Ensure the external fan is supported, if necessary. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
4. Close unused cable entries with suitable seal inserts. Please ensure the following: – The seals are made of resistant, approved material. – The degree of protection is guaranteed. Use sealing rings or adhesive, if necessary – Only open the cable entries with a tool. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Use the matching cable end pieces. ● Make sure the protective conductor connection is secure. ● Comply with the rating plate data and the terminal diagram in the terminal box when making the electrical connections. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
6 x 240 mm 2 x 35 mm 2 x 70 mm tion Auxiliary terminals Terminal size Tightening torque 4 Nm 1.2 Nm 1.2 Nm Connectable cable cross-sec‐ 35 mm 6 mm 6 mm tion SIMOTICS DC 1GG5 Operating Instructions 02/2016...
DIN 128. Connection without cable lugs If terminal box size gk 602 or gk 702 is mounted on the machine, you can also connect the cables without cable lugs. Image 6-3 Connection without cable lugs SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Different values apply to cable lugs or grounding terminals. Table 6-3 Tightening torque of screws with cable lugs Bolt Screw-in depth Tightening torque M12 x 25 > 16 mm 38 Nm M16 x 35 > 20 mm 92 Nm SIMOTICS DC 1GG5 Operating Instructions 02/2016...
When performing any installation work you must always take care to ensure that all equipotential bonding connections remain effective. Connecting the auxiliary circuits Auxiliary circuit Terminal strips for cable cross-sections of up to 2.5 mm are provided for connecting auxiliary circuits, e.g. temperature sensor or anti-condensation heating. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 57
On machines with temperature sensors, design the temperature evaluation and control circuits in such a way that it is impossible for the machine to switch on and start to rotate automatically. . SIMOTICS DC 1GG5 Operating Instructions 02/2016...
When connecting the temperature sensor to external temperature monitoring devices, when required, apply additional measures to fully comply with the requirement "Hazard due to electric shock," see IEC 60664-1 or IEC 61800-5-1. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
– With a U-shaped terminal box casing, the entry plate is aligned and secured in such a way that the seat for the box cover seal is continuous all the way round. 2. Then close the terminal box. Tightening torque for the cover fastening screws is 22 Nm. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 60
Electrical connection 6.11 Completing connection work SIMOTICS DC 1GG5 Operating Instructions 02/2016...
– Gear tooth flank play and gear tooth tip play, as well as radial play, are properly adjusted if there is a gearwheel output. ● The minimum insulation resistance values are within tolerance. ● If the bearings are insulated, the insulation has not been bridged. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Detailed information on testing and the limit values can be found here: "Testing the insulation resistance and polarization index" (Page 34) Greasing the roller bearings prior to commissioning The following information assumes that the specified storage conditions have been complied with. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Transport and storage (Page 25) Minimum radial forces for cylindrical roller bearings Note Maintaining the minimum radial forces Operating roller bearings without a load can damage them. Maintain the minimum radial forces specified when using cylindrical roller bearings. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
In operation on a 60 Hz supply, the external fan motor can overheat or burn out. If you intend ① to operate the external fan on a 60 Hz mains supply, then fit the cover sheet with the screws provided under the air-outlet grille before you commission the motor. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● In case of uneven running or abnormal noise, switch off the machine. Determine the cause as it coasts. ● If the mechanical operation improves immediately after the motor is switched off, the cause is magnetic or electrical. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Interlock the control in such a way that the armature circuit can be connected only when the exciter circuit is energized. ● If the exciter circuit fails, switch off the armature circuit immediately. See also Safety notes (Page 13) SIMOTICS DC 1GG5 Operating Instructions 02/2016...
1. Switch the machine off. 2. Switch off any external fans. 3. Switch off the coolant supply. Follow the operating instructions provided by the manufacturer. 4. Switch on the anti-condensation heating. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 68
Commissioning 7.8 Switch off SIMOTICS DC 1GG5 Operating Instructions 02/2016...
This can cause faults which can result in eventual or immediate death, serious injury or material damage. ● Immediately inform the maintenance personnel. ● If you are in doubt, immediately switch off the motor, being sure to observe the system- specific safety conditions. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
The vibration response of the system at the location where it is installed can result in greater vibration magnitudes on the motor. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
≤ 2,55 If higher levels of vibration than the above specified occur in operation, special measures must be taken. For more information, please contact your local Siemens sales office. Regreasing roller bearings Refer to the regreasing instructions for the roller bearings on the lubricant plate.
● If the machine has been non-operational for longer than a year, regrease the bearings before commissioning. Turn the shaft to distribute the grease in the bearings. ● Pay attention to the instructions on the lubricant plate. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Can the machine be put into operation? ● Must the windings be cleaned or dried? Detailed information on testing and the limit values can be found here: "Testing the insulation resistance and polarization index" (Page 34) SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Loading at standstill Load stationary DC motors with armature current only for short periods so as to protect the commutator against damage. Obtain the permissible current and time values for loading at standstill from the manufacturer. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Immediately perform an inspection after such faults. Correct the cause of the fault as described in the respective remedial measures section. Repair any damage to the machine. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Wrong direction of rotation of the external fan Check the electrical connections to the external fan. External fan is not running Check the external fan and its connections. Reduced air flow Check the air ducts; clean the machine. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Too much grease in bearing Remove surplus grease. Wrong grease in the bearing Use the correct grease. Friction marks on raceway Replace the bearing. Scoring (brinelling) Replace the bearing. Avoid any vibration at standstill SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Machine damage If the machine is not maintained it can suffer damage. This can cause faults which can result in eventual or immediate death, serious injury or material damage. Perform regular maintenance on the machine. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Perform the initial inspection after installing or commissioning the motor. Normally the initial inspection is only necessary after approx. 500 hours of operation. ● Perform follow-up inspections after every approx. 2,000 hours of operation. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 83
The brush height must be reduced to below the minimum. ● Any defects discovered during checking should be fully corrected. Note The inspection measures may be required depending on the plant specification and operating conditions. See also Inspection at standstill (Page 126) SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● The relevant technical data are observed: power consumption, temperature of windings, bearings, coolants, etc. ● There should be no oil, grease, or water leakages. ● The smooth running characteristics and motor running noise have not deteriorated. ● No impermissible brush sparking occurs in operation. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
The rotor can fall out when work is being carried out on the locating bearing and the motor is vertical. This can result in death, serious injury or material damage. Support or relieve the rotor of any load when work is being carried out with the machine in a vertical position. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Special types of grease are used on machines that are designed for use at temperatures below -20 °C. These grease types are specified on the lubricant plate. Other types of grease are not permitted. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
In normal operation, check regularly to ensure the carbon brushes are in good contact with the commutator and are moving freely in the brush guides. Brush height The wear limit of carbon brushes is indicated by a line or by the lower edge of the manufacturer's name stamp. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Avoid damaging the brush edges when grinding in the new carbon brushes. 6. Carefully remove the emery cloth and any adhesive-tape residue left behind on the commutator surface. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Clean the slots between the commutator segments with a suitable wooden slat or glass pencil. Note Sparking or flashover caused by unclean slots Dirty slots can cause sparking or flashovers on the commutator. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 90
(d ) given in the following table. Table 9-3 Commutator overhaul – minimum permissible diameter Shaft height Nominal diameter d (mm) Minimum diameter d (mm) 1G.5 / 1H.5 1G.6 / 1H.6 1G.7 / 1H.7 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Terminal boxes must be regularly checked for tightness, undamaged insulation, and tight terminal connections. ● If dust or humidity have infiltrated the terminal box, this should be cleaned and dried (particularly the insulators). SIMOTICS DC 1GG5 Operating Instructions 02/2016...
(Page 13) and the specifications contained in EN 50110‑1 regarding safe operation of electrical equipment. Note If the motor has to be transported, please observe the information and instructions in the "Transport" (Page 25) section. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
If the motor is in a vertical position, the rotor can fall out while work is being performed on the locating bearing. This can result in death, serious injury or damage. ● Support or unload the rotor when carrying out work with the machine in a vertical position. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
3. Ensure correct assignment and orientation of the parts: bearings, sealing rings, compression springs, spring washers, covers with different centering lengths. 4. When removing the DE bearing shield, make sure that the windings that project from the stator frame do not become damaged. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
For example, use split rings, spring washers, or LOCTITE. The clamping length is taken as the distance between the head of the bolt and the point at which the bolt is screwed in. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Speed sensor ● If you are using a speed sensor with an inner V-ring on the outer bearing cover, the V-ring must be positioned against the shoulder of the shaft journal. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Recommended torques for tightening the shaft journal Thread size Torque [Nm] Assembly Reinstall the disassembled speed sensor and secure it in position. The legend numbers in the following illustration are explained in chapter Spare parts / Speed sensor (Page 112). SIMOTICS DC 1GG5 Operating Instructions 02/2016...
1. Unscrew the speed-sensor stator and move it away, axially. 2. Remove the speed-sensor rotor. To do this, release the lateral set screw in the shaft journal and pull the rotor out, axially. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Push the cylindrical shaft extension of the speed-sensor rotor as far as possible into the shaft journal and secure it with the lateral set screw (M4 x 6). ● Use removable LOCTITE and a tightening torque of 13 Nm to attach the set screw. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Firmly reattach the speed encoder that was removed. If a different design is used, the installation and operating instructions of the speed encoder manufacturer apply. The legend numbers in the following illustration are explained in chapter Spare parts / Speed encoder (Page 112). SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 101
Thread size Tightening torque [Nm] 1. Check the elastic connecting link (coupling star) to ensure that it is in a good condition and in the correct mounting position. 2. Mount the complete speed encoder. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Example ● Terminal box type ● Terminal box cover (part 20.30 ) ● Serial number of the motor ● Machine type SIMOTICS DC 1GG5 Operating Instructions 02/2016...
You can use "Spares on Web" to determine the order numbers for motor spare parts quickly and easily. A short description of how to use "Spares on Web" is available on the Internet. Guide for Spares on Web (http://support.automation.siemens.com/WW/news/en/25248626). 10.3 Using commercially available spare parts You can use commercially available, standard components, but ensure that they have the same construction type, dimensions, strength class etc.
Brush holder 10.74 Cover with seal 24.60 Single-acting clamping shoes for brush holder 10.75 Cover with seal 24.65 Fixing lugs for brush spindle 10.84 Cover with seal 24.68 Clips for brushholder 10.85 Cover with seal SIMOTICS DC 1GG5 Operating Instructions 02/2016...
External fan 1GG5 with two external fan motors (A) Table 10-2 Spare parts external fan 1GG5 Designation Designation 32.10 Housing 34.31 External grille cover 32.15 Seal 34.32 Filter mat 32.30 Louvered cover 34.33 Inside basket SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Rolling-contact bearing for 1G.5, 1H.5, shaft heights 500 to 630 Table 10-3 Spare parts rolling-contact bearing for 1G.5, 1H.5, shaft heights 500 to 630 Designation 4.00 Rolling-contact bearing bush (floating bearing) 5.00 End shield, drive end SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Rolling-contact bearing for 1G.5, 1H.5, shaft heights 500 to 630 Table 10-4 Spare parts rolling-contact bearing for 1G.5, 1H.5, shaft heights 500 to 630 Designation 3.00 Rolling-contact bearing bush (locating bearing) 6.00 End shield, non-drive end SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Spare parts main terminal box 1XB7710 Designation 20.20 Housing 20.28 Seal 20.30 Cover 20.38 Seal 20.51 Entry plate 21.43 Post insulator 21.51 Terminal block for auxiliary circuit 21.61 Terminal strip for auxiliary circuit 22.30 Connection busbar for power circuit SIMOTICS DC 1GG5 Operating Instructions 02/2016...
20.38 Seal 20.51 Entry plate with seal 21.43 Post insulator 21.51 Terminal block for auxiliary circuit 21.61 Terminal strip for auxiliary circuits 22.30 Connection busbar for power circuit 22.70 Terminal strip for PE conductor SIMOTICS DC 1GG5 Operating Instructions 02/2016...
55.10.1 Speed-sensor rotor 55.10.5 Fastening screw 55.10.8 Carbon brushes 55.20 Bearing covers for speed sensor mounting 55.30 Threaded shaft journal with taper 55.38 V ring See also Speed sensor with conical hub (Page 97) SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Bearing covers for speed sensor mounting 55.35 Tolerance ring 55.42.1 Coupling halves at speed-sensor end for cylindrical speed-sensor shaft 55.42.5 Locking screw 55.44 Coupling star See also Speed sensor for construction type IM B5 (Page 100) SIMOTICS DC 1GG5 Operating Instructions 02/2016...
The machine is made up of heavy parts. These parts are liable to fall during dismantling. This can result in death, serious injury or material damage. Before you release any machine parts, secure them so that they cannot fall. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
● Wooden packaging for sea transport consists of impregnated wood. Observe the local regulations. ● The foil used for water-proof packaging is an aluminum composite foil. It can be recycled thermally. Dirty foil must be disposed of via waste incineration. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
You can find your contact person in the relevant contact database: www.siemens.com/yourcontact (www.siemens.com/yourcontact) SIOS App You can obtain optimum support everywhere using the SIOS App. The SIOS App is available for Apple iOS, Android and Windows phone. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 118
Service and Support SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Table B-1 Tightening torques for screw/bolt connections with a tolerance of ±10% Case 1080 1700 2600 4200 1200 2000 3100 4700 7500 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 120
Note Non-standard tightening torques Different tightening torques for electrical connections and bolted connections for parts with flat seals or insulating parts are specified in the relevant sections and drawings. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Quality documents You can find the quality documents here: https://support.industry.siemens.com/cs/ww/de/ps/13419/cert (https:// support.industry.siemens.com/cs/ww/en/ps/13419/cert) SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 122
Quality documents SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Checklists When carrying out any work on the machine, observe the general safety instructions (Page 13) and the specifications contained in EN 50110‑1 regarding safe operation of electrical equipment. SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Temperatures of the bearings, windings, etc., monitored and logged until the sys‐ tem reaches a steady state. Operating time reduced accordingly if the water-to-water cooler (if installed) is not operated at this "preliminary" dry run stage. Note: Date Name Signature SIMOTICS DC 1GG5 Operating Instructions 02/2016...
If an air-to-water heat exchanger is installed, the water cooler is connected, filled, air bled, and ready to run A test run has been carried out without water cooling where there has been a lengthy time delay between assembly and commissioning Note: Date Name Signature SIMOTICS DC 1GG5 Operating Instructions 02/2016...
If heat exchanger is installed: filter change or filter cleaning Check bearing seals Operating hours Sealing of machine If heat exchanger is installed: Check heat exchanger seals Next recommended inspection date: Other remarks: Date Name Signature SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 131
94 Turning the machine on to its side, 38 Type of balancing, 40 Safety instructions Flammable substances, 15 Vibration magnitudes, 70 Hazardous substances, 15 Vibration values, 24 Hot surfaces, 15 Live parts, 14 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 132
Index Wall face, 37 Wall mounting, 37 Water drain holes, 43 SIMOTICS DC 1GG5 Operating Instructions 02/2016...
Page 134
Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY www.siemens.com/drives...