Installing the Supervisor in the Cisco cBR Chassis
Step 3
Connect the type-A USB connector of the console cable to the Exar XR21V1410 UART with USB interface.
Step 4
Connect the Exar XR21V1410 UART to the appropriate serial port on the PC or terminal using a cable with type-A USB
connector on one end and DB-9 connector on the other end.
Step 5
Power up the PC or terminal.
Step 6
Configure the PC terminal emulation software or the terminal with the following settings:
• 9600 baud
• 8 data bits
• No parity generation or checking
• 1 stop bit
• No flow control

Installing the Supervisor 250G

Installing the Supervisor PIC in the Cisco cBR Chassis

Perform this procedure to install the following PICs:
• Supervisor PIC
• Blank PIC for the Supervisor
Note
Do not support mix use of 250G and 160G SUP and SUP-PIC.
Before you begin
Warning
If you are adding a new Supervisor PIC or upgrading the existing Supervisor PICs, ensure that the power
modules installed in the chassis are adequate to support the Supervisor PICs.
• Attach an ESD-preventive wrist strap to your wrist and connect the other end to the grounding lug
• Be aware of the weight and size of the equipment. Handle it with care.
Restrictions
• If you are using a single Supervisor, you must install the Supervisor PIC in the slot corresponding to the
connected to the chassis.
Supervisor Card.
Cisco Converged Broadband Routers Hardware Installation Guide
Installing the Supervisor 250G