Installing a Supervisor Engine or Route Switch Processor
Table 3-1
Module
Supervisor Engine 32
Supervisor Engine 2
Installing a Supervisor Engine or Route Switch Processor
To install a supervisor engine or route switch processor module in the router, perform the following
steps:
To prevent ESD damage, handle modules by the carrier edges only.
Caution
Choose a slot for the module (see
Step 1
any equipment that will be connected to the ports on the module. If possible, place modules between
empty slots that contain only blank module filler plates.
a.
b.
Verify that the captive installation screws are tightened on all of the modules installed in the chassis.
Step 2
This step ensures that the EMI gaskets on all modules are fully compressed in order to maximize the
opening space for the new or replacement module.
Note
Fully open both ejector levers on the new module. (See
Step 3
Cisco 7600 Series Router Supervisor Engine and Route Switch Processor Guide
3-4
Supervisor Engine and Route Switch Processor Slot Assignments (continued)
If a blank module filler plate is installed in the slot in which you plan to install the module, remove
the plate by removing its two Phillips pan-head screws.
If another module is installed in the slot, remove the module by following the procedure in the
"Removing a Supervisor Engine or Route Switch Processor" section on page
If the captive installation screws are loose, the EMI gaskets on the installed modules will push
adjacent modules toward the open slot, which reduces the opening size and makes it difficult to
install the new module.
Chapter 3
Installing and Configuring Route Switch Processors and Supervisor Engines
Slot Assignments
Slots 1 and 2 (4-slot chassis)
•
Slots 5 and 6 (6-slot and 9-slot chassis)
•
Slots 7 and 8 (13-slot chassis)
•
Not supported in the 3-slot chassis
•
Slots 1 and 2 (all chassis)
•
Not supported in the 4-slot chassis
•
Table
3-1). Make sure that there is enough clearance to accommodate
Figure
3-7.
3-1.)
OL-10100-04