hit counter script

Powering Up The Cisco Cbr Chassis; Powering Up The Cisco Cbr - Cisco cBR Series Hardware Installation Manual

Converged broadband routers
Hide thumbs Also See for cBR Series:
Table of Contents

Advertisement

Powering Up the Cisco cBR Chassis

Powering Up the Cisco cBR

Before you begin
After all the interfaces and other cables are connected, perform a visual check of all connections and check
that:
• The ejector levers on each line card are in the locked position.
• All the top and bottom line card captive screws are tight.
• All network interface cables are connected.
• The console terminal is turned on.
Step 1
Make sure the
chassis ground connection
Step 2
Push the toggle switch on the FPEM (AC or DC) on the rear of the chassis to ON position.
What to do next
Ensure the POWER ENABLE LED on the FPEM illuminates green.
Verify if the LEDs on the Power Modules indicate input voltage presence within correct range.
Powering Up the Cisco cBR, on page 159
is attached.
C H A P T E R
Cisco Converged Broadband Routers Hardware Installation Guide
8
159

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbr-8

Table of Contents