hit counter script

Osi/Ip Scenario 8: Osi Oss, Osi Dcn, Ons Gne, Osi Dcc, And Other Vender Nes - Cisco ONS 15600 Reference Manual

Hide thumbs Also See for ONS 15600:
Table of Contents

Advertisement

9.7.9 OSI/IP Networking Scenarios
Management traffic between CTC/CTM and ONS 15600 NEs is carried over an IP-over-CLNS tunnel.
A static route is configured on the ONS 15600 that terminates the tunnel (ONS 15600 NE 1) so that
downstream ONS 15600 NEs (ONS 15600 NE 2 and 3) know how to reach CTC/CTM.

9.7.9.8 OSI/IP Scenario 8: OSI OSS, OSI DCN, ONS GNE, OSI DCC, and Other Vender NEs

OSI/IP Scenario 8
7, the ONS 15600 NEs are solely managed by CTC/CTM. The CTC/CTM IP traffic is carried over a
IP-over-OSI tunnel between an external router and the ONS 15600 GNE. The GNE extracts the IP from
the tunnel and forwards it to the destination ONS 15600. Management traffic between the OSS and other
vendor NEs is routed by the ONS 15600 GNE and NEs. This is possible because all ONS 15600 NEs run
dual stacks (OSI and IP).
Cisco ONS 15600 Reference Manual, R6.0
9-54
TL1 management is not required.
FTP file transfer is not required.
TL1 and FTAM to FTP mediation is not required.
(Figure
9-37) is another example of a European network. Similar to OSI/IP Scenario
Chapter 9
Management Network Connectivity

Advertisement

Table of Contents
loading

Table of Contents