Install the Bay and Backplane Connections
This chapter provides procedures for installing the Cisco ONS 15600. To view a summary of the tools
and equipment required for installation, see the
Before You Begin
This section lists the chapter procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
Perform these procedures in the order they appear.
1.
2.
3.
4.
5.
6.
7.
8.
9.
Warning
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Statement 1030
Warning
This unit is intended for installation in restricted access areas. A restricted access area can be
accessed only through the use of a special tool, lock and key, or other means of security.
Statement 1017
78-17203-01
NTP-E1 Unpack and Inspect the ONS 15600 Bay Assembly, page
before continuing with the
NTP-E2 Install the Bay Assembly, page
NTP-E3 Open and Remove the Front Door, page
equipment before continuing with other procedures in this chapter.
NTP-E104 Install Cable Routing Modules and Kick Plates, page
remove the existing cable routers and install the cable routing modules (CRMs).
NTP-E4 Install the Bay Power and Ground, page
with the
"NTP-E5 Remove the Rear Cover" procedure on page
NTP-E5 Remove the Rear Cover, page
"NTP-E6 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections" procedure on
page
1-11.
NTP-E6 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections, page
needed to set up connections on the backplane.
NTP-E8 Replace the Rear Cover, page
NTP-E7 Perform the Bay Installation Acceptance Test, page
determine if you have correctly completed all other procedures in the chapter.
"Required Tools and Equipment" section on page
"NTP-E2 Install the Bay Assembly" procedure on page
1-5—Complete this procedure to install the bay assembly.
1-6—Complete this procedure to access the
1-9—Complete this procedure before continuing
1-11—Complete this procedure before continuing with the
1-12—Complete as needed to install the rear cover.
C H A P T E R
1-4—Complete this procedure
1-8—Complete as needed to
1-11.
1-11—Complete as
1-13—Complete this procedure to
Cisco ONS 15600 Procedure Guide, R7.0
1
1-2.
1-5.
1-1

Advertisement

loading

Summary of Contents for Cisco ONS 15600

  • Page 1 C H A P T E R Install the Bay and Backplane Connections This chapter provides procedures for installing the Cisco ONS 15600. To view a summary of the tools and equipment required for installation, see the “Required Tools and Equipment” section on page 1-2.
  • Page 2 You will need the following tools and equipment to install and test the ONS 15600. Included Materials The ONS 15600 bay ship kit is shipped with the ONS 15600. The under-floor power kit is an optional item and is used in environments where power is supplied through the floor, rather than overhead. You can also order installation dollies to help you with unloading the bay from the shipping pallet;...
  • Page 3 – 8-32 flathead screws (10) – User-Supplied Materials The following materials and tools are required but are not supplied with the ONS 15600: Power cable, rated for at least 125-A capacity • Ground cable, rated for at least 125-A capacity •...
  • Page 4 Visible laser source • Optical power meter • NTP-E1 Unpack and Inspect the ONS 15600 Bay Assembly Purpose This procedure explains how to unpack the ONS 15600 and verify the contents. Tools/Equipment Scissors Phillips screwdriver 3/4-inch socket wrench Prerequisite Procedures None...
  • Page 5 6-inch (or greater) ratchet extension (optional) 1 1/8-inch socket 15/16-inch socket Rectangular seismic washers (4) (53-2141-XX) 5/8-inch floor anchor bolts (4) Prerequisite Procedures NTP-E1 Unpack and Inspect the ONS 15600 Bay Assembly, page 1-4 Required/As Needed Required Onsite/Remote Onsite Security Level None This unit must be installed in a rack that is secured to the building structure.
  • Page 6 Note The ONS 15600 has an ESD plug input and is shipped with an ESD wrist strap. One ESD plug input is located on the outside edge of the shelf on the left-hand side, and the other is located at the bottom rear of the shelf.
  • Page 7 Step 3 Lift the door off its hinge pins and remove it. Set the door aside so you can reinstall it after you complete Step 4 Chapter 2, “Install Cards and Fiber-Optic Cable.” Cisco ONS 15600 Procedure Guide, R7.0 78-17203-01...
  • Page 8 Step 1 page 17-33. If you need to remove narrow CRMs (vertical fiber routers) so you can install wide CRMs, complete the Step 2 “DLP-E120 Remove the Narrow CRMs” task on page 17-18. Cisco ONS 15600 Procedure Guide, R7.0 78-17203-01...
  • Page 9 Onsite/Remote Onsite Security Level None Warning This product requires short-circuit (overcurrent) protection, to be provided as part of the building installation. Install only in accordance with national and local wiring regulations. Statement 1045 Cisco ONS 15600 Procedure Guide, R7.0 78-17203-01...
  • Page 10 Warning Use copper conductors only. Statement 1025 Always use the supplied ESD wristband when working with a powered ONS 15600. Plug the wristband Caution cable into either the ESD jack located on the lower-left outside edge of the bay assembly, or the other ESD jack located at the bottom rear of the shelf.
  • Page 11 Step 4 Complete the “DLP-E14 Install the TL1 Craft Interface Cable” task on page 16-21 as needed. Craft cables (or the RJ-45 port on the TSC) are required to access TL1. Cisco ONS 15600 Procedure Guide, R7.0 1-11 78-17203-01...
  • Page 12 Install the Bay and Backplane Connections NTP- E8 Replace the Rear Cover Always use the supplied ESD wristband when working with a powered ONS 15600. Plug the wristband Caution cable into either the ESD jack located on the lower-left outside edge of the bay assembly, or the other ESD jack located at the bottom rear of the shelf.
  • Page 13 Tools/Equipment Voltmeter Prerequisite Procedures NTP-E1 Unpack and Inspect the ONS 15600 Bay Assembly, page 1-4 NTP-E2 Install the Bay Assembly, page 1-5 NTP-E3 Open and Remove the Front Door, page 1-6 NTP-E4 Install the Bay Power and Ground, page 1-9...
  • Page 14 Chapter 1 Install the Bay and Backplane Connections NTP- E7 Perform the Bay Installation Acceptance Test Cisco ONS 15600 Procedure Guide, R7.0 1-14 78-17203-01...