hit counter script

Cisco NCS 2006 Hardware Installation Manual page 368

Ncs 2000 series
Table of Contents

Advertisement

DLP-L81 Connecting Office Power (AC) to the NCS 2015 Shelf
Step 3
Tighten the bail latch screws to firmly hold the AC power cable with the connector in the power in the figure
below.
Figure 196: Connecting Office Power — AC Power Modules
1
Step 4
Connect the power cable to the fuse panel or power source.
Note
Note
Step 5
Return to your originating procedure (NTP).
Table 18: PIDs for AC Power Cables
Cable
North America
Australia
Cisco NCS 2000 Series Hardware Installation Guide
340
The voltage rating value for AC power ranges between 100 VAC to 240 VAC depending on the
standards of various countries.
Turn on the power using the power switch on the NCS 2015 shelf after installing the power cables.
Bail latch screws
PID
CRS-AC-CAB-NA
CRS-AC-CAB-AU
Connecting Power and Ground

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 2002Ncs 201

Table of Contents