Installing the Cisco NCS 2006 Door and Other Modules
Step 3
Place the deep-front panel close to the shelf so that the shelf notches and the deep-front panel retention features
are in line, as shown in the figure below.
Figure 153: Placing Deep-Front Panel and Shelf in line
Step 4
Align the deep-front panel with the shelf by performing the following sub-steps at the same time.
a) Align the right and left retention features of the deep-front panel with the right and left notches present
on the top of the shelf. See the above figure.
NTP-L39 Install the Deep-Front Panel of the NCS 2006
Cisco NCS 2000 Series Hardware Installation Guide
261