Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
1
Checking Fluid Levels
No Parts Required
Procedure
Before starting the engine for the first time, check the
following fluid levels:
• Engine oil
Refer to Checking the Engine Oil.
Description
No parts required
Large O-ring
Counter weight
Steering locking pin
Lift chain
Chain bracket
U-bolt
Nut
Screw
Washer
Nut
Large O-ring
No parts required
Calcium chloride (obtain separately)
Rear weight kit, part number 104–1478
(obtain separately)
CE decals
CE certificate
Operator's Manual
Engine Operator's Manual
Parts Catalog
Operator Training Material
Diagnostic ACE display overlay
Ignition keys on ring
Hood lock key
Screw
Wing nut
Qty.
–
Check fluid levels.
14/10
7/5
Install cutting units.
7/5
5/7
5/7
5/7
10/14
Install cutting units.
5/7
5/7
5/7
5/7
–
Make cutting unit adjustments if needed.
100lb
Add rear ballast (if required).
1
4
Install the CE decals.
2
1
1
1
1
Read the manuals and view the training
1
material before operating the machine.
1
1
2
2
• Engine coolant
Refer to Checking the Cooling System.
• Hydraulic oil
Refer to Checking the Hydraulic Oil.
• Rear axle lubricant
Refer to Checking the Rear Axle Lubricant.
14
Use