Site Preparation Checklist
Send documentation comments to mdsfeedback-doc@cisco.com.
Table D-1
Site Planning Checklist
Task No. Planning Activity
1
Space evaluation:
Space and layout
•
•
Floor covering
Impact and vibration
•
Lighting
•
•
Maintenance access
2
Environmental evaluation:
•
Ambient temperature
•
Humidity
Altitude
•
•
Atmospheric contamination
Air flow
•
3
Power evaluation:
•
Input power type
Power receptacles
•
•
Receptacle proximity to the
equipment
•
Dedicated circuit for power supply
Dedicated (separate) circuits for
•
redundant power supplies
2
UPS
for power failures
•
4
Grounding evaluation:
•
Circuit breaker size
CO ground (AC- powered systems)
•
Cisco MDS 9216 Switch Hardware Installation Guide
D-2
Verified By
1
Appendix D
Site Planning and Maintenance Records
Time
Date
78-16165-01