hit counter script

Preparing The Access Point; Installation Summary - Cisco Aironet 2600 Getting Started Manual

Hide thumbs Also See for Aironet 2600:
Table of Contents

Advertisement

Preparing the Access Point

Before you mount and deploy your access point, we recommend that you perform a site survey (or use
the site planning tool) to determine the best location to install your access point.
You should have the following information about your wireless network available:
• Access point locations.
• Access point mounting options: below a suspended ceiling, on a flat horizontal surface, or on a
desktop.
You can mount the access point above a suspended ceiling but you must purchase
Note
additional mounting hardware: See
additional information.
• Access point power options: power supplied by the recommended external power supply (Cisco
AIR-PWR-B), a DC power supply, PoE from a network device, or a PoE power injector/hub
(usually located in a wiring closet).
Access points mounted in a building's environmental airspace must be powered using PoE
Note
to comply with safety regulations.
Cisco recommends that you make a site map showing access point locations so that you can record the
device MAC addresses from each location and return them to the person who is planning or managing
your wireless network.

Installation Summary

Installing the access point involves these operations:
• Performing a pre-installation configuration (optional)
• Mounting the access point
• Grounding the access point
• Deploying the access point on the wireless network
"Mounting the Access Point" section on page 15
for
11

Advertisement

Table of Contents
loading

Table of Contents