hit counter script

Cisco 7606-S Installation Manual page 87

Field-replaceable units (frus)
Hide thumbs Also See for 7606-S:
Table of Contents

Advertisement

Chapter 5
Removal and Replacement Procedures
You should allow a minimum of 2.5 to 3 inches (63.5 mm to 76.2 mm) of space between the side of the
Note
power supply and any obstructions (such as the side of an enclosed equipment rack). This space is needed
to install and secure the DC-input power cables correctly. Incorrectly routing the DC-input power cables
can cause airflow blockage into the power supply and inadequate strain relief in the cables. The exact
amount of space required depends upon the gauge and flexibility of the DC-input power cables you are
using.
Verify that power is off to the DC circuit that is connected to the power supply you are installing. Place
Step 1
appropriate safety flag and lockout devices at power switch handle to avoid any circuit inputs from
becoming energized.
Caution
Use both hands to install and remove power supplies. Each PWR-4000-DC weighs 31 pounds (14.1 kg).
Grasp the power supply handle with one hand, and place your other hand underneath the power supply.
Step 2
Slide the power supply into the power supply bay. Make sure that the power supply is fully seated in the
bay
(Figure
Figure 5-85 Handling a DC-Input Power Supply
0
Tighten the power supply captive installation screw
Step 3
OL-4503-24
5-85).
+
VE-1
+
VE-3
-
VE-1
-
VE-3
+
VE-2
VE-2
-
I
INPU T OK
FAN
OUTP UT
1
2
3
OK
FAIL
Removing and Replacing the Power Supply
(Figure
5-86).
Cisco 7600 Series Router Installation Guide
5-87

Advertisement

Table of Contents
loading

This manual is also suitable for:

7600 series

Table of Contents