As the switch powers on, it begins the POST, a series of tests that runs automatically to ensure that the
switch functions properly. LEDs can blink during the test. POST lasts approximately 1 minute. When
the switch begins POST, the System, RPS, Status, Duplex, and Speed LEDs turn green. The System LED
blinks green, and the other LEDs remain solid green.
When the POST completes successfully, the System LED remains green. The RPS LED remains green
for some time and then reflects the switch operating status. The other LEDs turn off and then reflect the
switch operating status. If a switch fails POST, the System LED turns amber.
POST failures are usually fatal. Call Cisco technical support representative if your switch fails POST.

Powering Off the Switch

After a successful POST, disconnect the power cord from the switch. Install the switch in a rack, on a
wall, on a table, or on a shelf as described in the

Installing the Switch

Rack-Mounting

Warning
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special
precautions to ensure that the system remains stable. The following guidelines are provided to
ensure your safety:
Installing the switch in a 24-inch rack requires an optional bracket kit that contains the 24-inch
rack-mounting brackets and hardware (RCKMNT-1RU=).
OL-6337-07
Rack-Mounting, page 2-7
Wall-Mounting, page 2-12
Table- or Shelf- Mounting, page 2-15
Removing Screws from the Switch, page 2-8
Attaching Brackets to the Catalyst 3560 Switch, page 2-8
Mounting the Switch in a Rack, page 2-10
Attaching the Cable Guide, page 2-11
This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the heaviest
component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in
the rack.
Statement 1006
"Installing the Switch" section on page
Catalyst 3560 Switch Hardware Installation Guide
Installing the Switch
2-7.
2-7

Advertisement

Table of Contents
loading

Table of Contents