Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
1
2
3
4
5
6
7
8
9
Description
Left weight mounting bracket
Latch rod
No parts required
Discharge tube
Qty.
4
4
1
1
4
Install the weight.
1
2
1
1
1
1
2
4
2
2
Install the attachment mount.
1
2
2
2
1
1
Assemble the bagger top.
1
1
Install the latch rod.
1
2
1
2
Install the bagger top.
4
4
-
Install the cutoff baffle.
-
Install the blowout baffle.
1
Install the chute.
1
Connect with the discharge tube.
4
Use