hit counter script

Checking Conditions Prior To System Startup - Cisco Catalyst CW9800H1 Hardware Installation Manual

Wireless controllers
Table of Contents

Advertisement

Power Up and Initial Configuration
This chapter guides you through a basic controller configuration, which is sufficient for you to access your
network. Complex configuration procedures are beyond the scope of this publication and can be found in the
modular configuration and command reference publications in the Cisco IOS software configuration
documentation set that corresponds to the software release installed on your Cisco hardware.

Checking Conditions Prior to System Startup

Ensure that all the card slots and compartments are closed. Install blank faceplates on empty slots. Always
have power supply slots filled. If you leave a power supply slot uncovered, then you risk exposure to hazardous
voltages on the power pins on the midplane.
Warning
Note
Ensure that the following conditions are addressed before starting up the controller:
• The network interface cable or the optional Management port cable is connected.
• The chassis is securely mounted and grounded.
Blank faceplates and cover panels serve three important functions: they prevent exposure to hazardous
voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might
disrupt other equipment; and they direct the flow of cooling air through the chassis. Do not operate
the system unless all cards, faceplates, front covers, and rear covers are in place.
Statement 1029
To view the boot sequence, you must have a console connection to the controller before it powers up.
Cisco Catalyst CW9800H1 and CW9800H2 Wireless Controllers Hardware Installation Guide
5
C H A P T E R
59

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst cw9800h2Catalyst cw9800m

Table of Contents