hit counter script

Rack-Mount The Chassis In A 2-Post Rack - Cisco CQ211L01-48H8FH Hardware Installation Manual

Table of Contents

Advertisement

Installing the Chassis

Rack-Mount the Chassis in a 2-Post Rack

This section describes how to install the
Caution
The following table lists the items contained in the rack-mount kit that is provided with the routers.
Table 5: Rack-Mount Kit
Quantity
2
8
Step 1
Install two rack-mount brackets to the
Determine which end of the chassis is to be located in the cold aisle:
• If the
the router so that its optical ports are in the cold aisle, and fans and power modules will be in the hot aisle.
• If the
router so that its fan and power supply modules are in the cold aisle and optical ports will be in the hot aisle.
13.25 in-lbs (1.5 N-m) torque value to attach the grounding plate to the chassis.
Note
grounding plate to the chassis.
With the bracket ears facing toward the center of the chassis, position a front rack-mount bracket on the side of the
chassis so that the four holes are aligned to four of the screw holes on the side of the chassis.
Use four M4 flat-head screws with 13.25 in-lbs (1.5 N-m) torque value to attach the bracket to the chassis.
Hardware Installation Guide for Cisco CQ211L01 Switch
18
If the rack is on wheels, ensure that the brakes are engaged or that the rack is otherwise stabilized.
Part Description
Rack-mount brackets
M4 x 0.7 x 6-mm Phillips flat-head screws
has port-side intake modules (fan modules and power modules with burgundy coloring), position
has port-side exhaust modules (fan modules and power modules with blue coloring), position the
Attach the grounding plate to the chassis. Use two M4 flat-head screws with
The C
chassis has a grounding cover label that must be removed before attaching the
:
Rack-Mount the Chassis in a 2-Post Rack
into a cabinet or 2-post rack.

Advertisement

Table of Contents
loading

Table of Contents