hit counter script

Clearance Requirements - Cisco CQ211L01-48H8FH Hardware Installation Manual

Table of Contents

Advertisement

Clearance Requirements

Clearance Requirements
The chassis requires front-to-back airflow. Leave at least 6.0 in. (15.24 cm) front and rear clearance for air
intake or exhaust. We recommend that you have at least 6.0 in. (15.24 cm) of space in front of the chassis to
provide room to maneuver the cables to make the required connections. Leave an extra 6.0 in. (15.24 cm) rear
clearance for removal and installation of power supplies and fan modules.
Figure 4: Clearances Required Around the Chassis
1
2
3
Chassis
6.0 in. (15.24 cm) front clearance for air
intake/exhaust.
23.6 in.( .
depth.
4
6.0 in. (15.24 cm) rear clearance for air intake/exhaust.
5
Additional 6.0 in. (15.24 cm) rear clearance for
removal and installation of power supplies and fan
modules.
cm) Chassis
Hardware Installation Guide for Cisco CQ211L01 Switch
Prepare for Installation
13

Advertisement

Table of Contents
loading

Table of Contents