hit counter script
Table of Contents

Advertisement

Installation Overview
Figure 55: AP Mounted on a Pole
1
One of four M6 keyhole slots for mounting the AP on the bracket.
2
Top and bottom sets of band clamp slots for passing the clamps through.
3
Top and bottom steel band clamps
4
Pole (wood, metal, or fiberglass), 2 to 5 inch (51 to 127mm) diameter
Before you begin
Ensure that you have the following materials before beginning to mount the AP to a pole:
Table 4: Materials Needed to Mount the AP on a Vertical Pole using AIR-MNT-VERT1= Kit
Materials Required
One wall mount bracket
Four M6 x12 mm hex head bolts
Two stainless steel band clamps (adjustable 2 to 5 inch (51 to 127 mm)
10–mm box-end wrench
Cisco Catalyst 9124AX Series Outdoor Access Point Hardware Installation Guide
Vertically Mounting the AP to a Pole
Supplied in the
Kit?
Yes
Yes
Yes
No
43

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 9124ax series

Table of Contents