C H A P T E R
2
Hardware Installation
This chapter provides procedures for installing a LightStream 2020 multiservice ATM switch
(LS2020 switch) in a networking environment. Installing an LS2020 switch involves several tasks in
two major categories:
1
Installing the LS2020 switch hardware
Separate sections in this chapter are devoted to the following topics:
— "Unpacking and Inspecting the LS2020 Switch Hardware"
— "Installing an LS2020 Switch in Rack"
— "Wiring a DC-Powered System"
— "Installing Fantails"
— "Attaching Data Cables"
— "Closing the Chassis"
— "Applying System Power"
Performing basic configuration procedures
2
The basic configuration tasks for the LS2020 switch are accomplished through configuration
scripts provided in this chapter.
Note
may not appear elsewhere in the LS2020 documentation set.
Unpacking and Inspecting the LS2020 Switch Hardware
When unpacking the LightStream 2020 switch, you should inspect the shipping container contents
to ensure the shipment is complete as well as check for damage that may have occurred during
shipment.
Step 1
Step 2
Step 3
Step 4
Refer to the LightStream 2020 Release Notes for important, release-specific information that
Check the shipping container before removing the LS2020 switch hardware from the
loading dock and inspect it for any signs of in-transit damage.
Transport the container to the systems area where the LS2020 switch is to be installed.
Cut the packing straps and lift the cardboard box off the LS2020 chassis. Remove the
packing material and bill of materials.
Check the bill of materials against the shipment received.
Hardware Installation 2-1