hit counter script

Turning On Power To The Router - Cisco CISCO10720 Installation And Configuration Manual

Internet router uplink cards installation and configuration
Table of Contents

Advertisement

Turning On Power to the Router

Figure 3-21
Using a Number 1 Phillips screwdriver, attach the cable-management cover to the cable-management
Step 5
tray. (See
Figure 3-22
Step 6
Use cable ties to secure the cables to the equipment mounting rack to keep the wires from accidental
bends or breaks. (See
Go to the
router.
Turning On Power to the Router
Perform the following steps to restore power to the router:
Book Title
3-16
Installing Cable-Management Cover
Figure
3-21.)
Cable-Management Tray and Router Installed in a Rack
RES ET
CON SOL
E AUX
DON NOT
REMO VE
OR INSER
WITH THE
T CABL
POW ER
ES
ON
Figure
3-22.)
"Turning On Power to the Router" section on page 3-16
Connecting the AC Power Supply, page 3-17
Connecting the DC Power Supply, page 3-19
RE SE T
CO NS
OL E AU
X
C IS C O
1 0 7 2 0 IN
T E R N E
T R O U T
E R
AC OK
DC OK
OTF
AC OK
DC OK
OTF
INPU T 100-
200- 50/6
0Hz 2-5A
Chapter 3
Installing and Removing the Uplink Cards
AC OK
DC OK
OT F
AC OK
DC OK
OT F
DON NOT
OR INS
REM OVE
ERT CAB
WIT H THE
LES
POW ER
ON
INP UT 100
-20 0- 50/
60H z 2-5
A
for instructions on powering on the
78-13113-06 B0

Advertisement

Table of Contents
loading

This manual is also suitable for:

10720

Table of Contents

Save PDF