hit counter script
Honeywell CBU146 Instructions Manual

Honeywell CBU146 Instructions Manual

Compact booster unit
Table of Contents

Advertisement

Quick Links

CBU146
Compact Booster Unit
To ensure the quality of potable water according to EN1717
Instructions

Advertisement

Table of Contents
loading

Summary of Contents for Honeywell CBU146

  • Page 1 CBU146 Compact Booster Unit To ensure the quality of potable water according to EN1717 Instructions...
  • Page 2: Table Of Contents

    5.1 Noise expectancy values ..............9 5.2 Authorised environmental conditions ............9 17. Declaration of no objection .............17 6. Shipping ....................10 18. Proof of Maintenance ...............18 6.1 Check condition upon delivery ............10 6.2 Transportation ..................10 7. Assembly ...................10 Honeywell GmbH Translation of original - MU1H-1376GE23 R1215...
  • Page 3: Safety Guidelines

    • for the compact booster unit itself • to other property. The basis for safe and error-free operation of the compact booster unit is knowledge of the instructions for safety and operation in this manual. MU1H-1376GE23 R1215 - Translation of original Honeywell GmbH...
  • Page 4: Mechanical Residual Dangers

    - Hazard to persons caused by electrical, thermal, mechanical, and chemical influences - Loss of important product functions - Failure to perform required maintenance and service measures - Environmental hazard caused by leakage of hazardous substances Honeywell GmbH Translation of original - MU1H-1376GE23 R1215...
  • Page 5: Basic Safety Measures

    For safety reasons, no unauthorised modifications may be made to the compact booster unit. • Keep unauthorised persons (e.g. children) away from the system. Parts and special equipment not delivered by Honeywell are also not autho- 1.12 Requirements for operating personnel rised by Honeywell for use.
  • Page 6: General Information

    Instructions for the pump In order to maintain the warranty, in the event of damage immediately Instructions for the pressure sensor contact the nearest Honeywell service centre. Instructions for the throttle valve 2.1 Conformity with the following norms Instructions for the membrane pressure vessel...
  • Page 7: Description

    • frequency converter adapted on the motor to ensure a constant supply pressure to the points of consumption construction and operation is according to DIN 1988,EN 1717 and EN 13077. Figure 1: CBU146 Construction Inlet Base frame Buffer tank Check valve...
  • Page 8: Version

    • Non-circular, free overflow according to EN 13077, Type AB Figure 2: CBU146 Inlet side • Drainage connection with integrated siphon trap: DN100 for CBU146-32A-060 and CBU146-40A-060 4.2 Outlet side DN150 for CBU146-50A-060, CBU146-65A-060, On the outlet side there is a diaphragm expansion vessel as well as a pres- CBU146-65B-060 and CBU146-80B-060 sure sensor and a pressure gauge.
  • Page 9: Technical Data

    5. Technical data Type Length Width Height Weight Inlet Pump [kW] [mm] [mm] [mm] [kg] CBU146-32A-060 " DN32 1543 1185 CBU146-40A-060 11.0 " DN40 1600 1185 CBU146-50A-060 19.0 G2" DN50 1965 1600 CBU146-65A-060 28.0 G2" DN65 1990 1600 CBU146-65B-060 34.0 "...
  • Page 10: Shipping

    2. In the case of transport damage estimate the extent, document the Danger for persons, near-by systems and the the environment that damage and notify Honeywell immediately in writing. arises from the non-intented use of the compact booster unit. 6.2 Transportation Operate the compact booster unit only as intended.
  • Page 11: Inspection Before Assembly

    The compensator has to be accessible on the compact booster unit at any time for inspection purposes and for this reason should not be inclu- ded in the pipe insulation. The compensator is subject to wear. MU1H-1376GE23 R1215 - Translation of original Honeywell GmbH...
  • Page 12: Start-Up

    8. Start-up 8.3 Initial operation The initial start-up should be performed by Honeywell technical staff. Performance of tasks only by qualified personnel (see section 1.12). Caution The pipeline must be free of residue 8.1 Safety instructions for start-up Danger of damaging the pump/compact booster unit!
  • Page 13: Start-Up Checklist

    2. Rinse the tank and the integrated odour trap regularly. Maintenance should be performed by Honeywell technical staff. 3. Check if the overflow is sealed and clean. • If necessary contact the service department at Honeywell. 10.2.2Monitoring Operation Performance of tasks only by qualified personnel (see section 1.12).
  • Page 14: 3Checklist For Inspection

    2. Secure the system against unintentional operation 10.3 Maintenance Empty the compact booster unit if it is shut down for a longer period of Maintenance should be performed by Honeywell technical staff. time. 12.2 Restarting the compact booster unit Alterations or modifications of the system are only permitted with the Please note the procedures in chapter 8.
  • Page 15: Disassembly, Disposal

    Frequency inverter - Pump drive 5.5 kW DN50 0904169 Frequency inverter - Pump drive 7.5 kW DN65A 0904170 Frequency inverter - Pump drive 11 kW DN65B 0904171 Frequency inverter - Pump drive 15 kW DN80 0904172 Honeywell GmbH Translation of original - MU1H-1376GE23 R1215...
  • Page 16: Start-Up Protocol

    16. Start-up protocol The following so-called Honeywell Compact Booster Unit was commisioned today by the signatories, authorised Honeywell customer service staff, and this protocol was written. 1 Compact booster unit Series ..................Size ..................Serial number ..................Order number ..................
  • Page 17: Declaration Of No Objection

    The following safety precautions regarding rinsing medium, residual fluids and their disposal are required: .................................................................. We ensure that the above information is correct and complete and delivery will be made according to statutory requirements............................................City, date and signature Address Company stamp MU1H-1376GE23 R1215 - Translation of original Honeywell GmbH...
  • Page 18: Proof Of Maintenance

    This compact booster unit is subject to the standards for potable water and guidelines for maintenance therein, and have to be maintained regularly by qualified personnel and the results have to be documented. Date Operating company Name Signature Honeywell GmbH Translation of original - MU1H-1376GE23 R1215...
  • Page 19 MU1H-1376GE23 R1215 - Translation of original Honeywell GmbH...
  • Page 20 Automation and Control Solutions Manufactured for and on behalf of the Environmental and Combustion Controls Division of Honeywell GmbH Honeywell Technologies Sàrl, Z.A. La Pièce 16, Hardhofweg 1180 Rolle, Switzerland by its Authorised Representative Honeywell GmbH 74821 MOSBACH MU1H-1376GE23 R1215...

Table of Contents