Chapter 2
Installing the Router
Figure 2-8
Step 2
Orient the antenna perpendicular with respect to the floor.
Figure 2-9
Mounting the Cisco 812 ISR
This section describes the steps in mounting the Cisco 812 ISR in several configurations, including on
a suspended ceiling, on a hard ceiling or wall, and on an electrical or network box. This section contains
the following topics:
•
Installing the 3G Antenna
3G Antenna Installed
Mounting Hardware, page 2-10
Figure 2-9
Cisco Integrated Services Router Hardware Installation Guide
Installing the Cisco 810 ISR
shows the 3G antenna installed.
2-9