hit counter script

Quick Start Up Overview - Siemens SITRANS WW300 Operating Instructions Manual

Weighfeeders
Hide thumbs Also See for SITRANS WW300:
Table of Contents

Advertisement

Quick Start Up Overview

1.
Verify that the weighfeeder is installed properly as described in the "Mechanical
installation" on page 7. Verify that the belt is tracking and the shear gate (if used) is
properly set.
2.
Verify that the weighfeeder, integrator/controller, and variable speed drive (AC or DC,
if present) are all properly wired.
3.
Verify that the data on the design data sheet included with this manual is correct
and modify if required.
4.
Refer to the supplied integrator/controller information for calibration and
configuration information.
7ML19985MQ01
SITRANS WW300 - OPERATING INSTRUCTIONS
Page 17

Advertisement

Table of Contents
loading

Table of Contents